Xinfeng power station (赣浙能源信丰电厂) is an operating power station of at least 1320-megawatts (MW) in Datangbu Town, Xinfeng County, Ganzhou, Jiangxi, China with multiple units, some of which are not currently operating. It is also known as 国家电投信丰电厂2×1000MW机组工程, 信丰电厂二期.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xinfeng power station Datangbu Town, Xinfeng County, Ganzhou, Jiangxi, China 25.317591, 114.919885 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase II Unit 4, Unit 1, Unit 2: 25.317591, 114.919885
  • Phase II Unit 3: 25.165744, 114.54399

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase II Unit 3 permitted coal - unknown 1000 ultra-supercritical 2025
Phase II Unit 4 permitted coal - unknown 1000 ultra-supercritical 2026
Unit 1 operating coal - unknown 660 ultra-supercritical 2022
Unit 2 operating coal - unknown 660 ultra-supercritical 2022

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase II Unit 3 Jiangxi Zhejiang Guohua (Xinfeng) Power Generation Co Ltd [100.0%]
Phase II Unit 4 Jiangxi Zhejiang Guohua (Xinfeng) Power Generation Co Ltd [100.0%]
Unit 1 Jiangxi Zhejiang Guohua (Xinfeng) Power Generation Co Ltd [100.0%]
Unit 2 Jiangxi Zhejiang Guohua (Xinfeng) Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): July 26, 2023[1], June 17, 2015 – 内发改能源字〔2015〕717号[2], July 26, 2023 – 赣评审字〔2023〕112号[1], June 17, 2015 – 内发改能源字〔2015〕717号[2]

Background on Project

Xinfeng power station was initially proposed as a 2 x 1,000 MW ultra-supercritical coal plant in Datangbu Town, Xinfeng County. It was proposed by Shenhua Group.[3]

As of September 2017, the project was seeking environmental clearance.[4]

In August 2018, the project sponsor changed to Jiangxi Provincial Investment Group, and the capacity to 2 x 660 MW.[5] In February 2019, Zhejiang Provincial Energy Group and National Energy Investment Group also became sponsors.[6]

The project was permitted for construction in May 2019.[7] Construction began in March 2020.[8]

The two units were operating by June 2022.[9][10]

In May 2023, the Feasibility Study Report Review Meeting was held for a 2 × 1,000 MW Unit Engineering. The Jiangxi Provincial Department of Natural Resources accepted the application for land pre-examination and site selection. In July 2023, additional surveys were underway. The project was planned to start construction in December 2023, put in one unit in December 2025, and the other by March 2026.[11][12]

Articles and Resources

References

  1. 1.0 1.1 "江西省发展改革委关于国家电投信丰电厂2×1000MW机组工程项目核准的批复". JiangxiDRC. 2023-07-27. Retrieved 2023-11-02.
  2. 2.0 2.1 https://web.archive.org/web/20240219021923/https://inews.nmgnews.com.cn/system/2015/06/24/011712208.shtml. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)
  3. "信丰电厂项目纳入国家电力发展“十三五”规划," Jiangxi Province, 2016-11-09
  4. "神华国华信丰电厂新建工程环境影响报告书拟受理情况的公示," 2017-09-13
  5. "信丰县政府与赣浙能源举行信丰电厂项目投资协议签约仪式," Jiangxi Energy Group, 2018/8/31
  6. "总投资120亿元 赣浙能源首个大型控股煤电项目取得突破性进展," 北极星电力网新闻中心, 2019/2/1
  7. "2×660MW!赣浙国华信丰电厂新建工程项目获批," 信丰新闻, 2019/5/23
  8. "赣浙国华信丰电厂新建工程按期开工," 北极星电力网新闻中心, 2020/3/16
  9. 信丰电厂首台机组正式投入运营, jxxf.gov, 2022-03-27
  10. 2×660MW!赣浙国华信丰电厂新建工程投产, BJX, 2022-07-01
  11. 国家电投新增2×1000MW超超临界燃煤发电机组 计划年底开工!, Weixin, 2023-07-13
  12. 火电|2×1000MW!年底开工!国家电投新增超超临界燃煤发电机组, Weixin, 2023-07-13