Xinjiang Alar Industrial Park Decarbonization and Desert Control solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Xinjiang Alar Industrial Park Decarbonization and Desert Control solar farm (新疆兵团一师阿拉尔市国电电力低碳转型150万千瓦光伏治沙项目) is a solar photovoltaic (PV) farm under construction in Alar City, Xinjiang, China.
Project Details
Table 1: Phase-level project details for Xinjiang Alar Industrial Park Decarbonization and Desert Control solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Construction[1] | 1500 MWac[2] | PV[2] | GD POWER Development Co Ltd (国电电力发展股份有限公司)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Xinjiang Alar Industrial Park Decarbonization and Desert Control solar farm
Location | Coordinates (WGS 84) |
---|---|
Alar City, Xinjiang, China[2] | 40.5120, 81.6098 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://baijiahao.baidu.com/s?id=1802658341107066172&wfr=spider&for=pc http://www.xjbt.gov.cn/c/2024-10-16/8362940.shtml, https://baijiahao.baidu.com/s?id=1802658341107066172&wfr=spider&for=pc.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://baijiahao.baidu.com/s?id=1802658341107066172&wfr=spider&for=pc.
{{cite web}}
: Missing or empty|title=
(help)