Xinjiang Alar Textile Park "Source/Grid/Load/Storage" solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Xinjiang Alar Textile Park "Source/Grid/Load/Storage" solar farm is a solar photovoltaic (PV) farm under construction in 10th Division of 1st Regiment of Xinjiang Production and Construction Corps, Alar City, Xinjiang, China.

Project Details

Table 1: Phase-level project details for Xinjiang Alar Textile Park "Source/Grid/Load/Storage" solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Construction[1] 2024 (planned)[1] 100 MWac[1] PV[1] State Power Investment Group Xinjiang Energy and Chemical CO LTD [100%] (国家电投集团新疆能源化工有限责任公司)[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Xinjiang Alar Textile Park "Source/Grid/Load/Storage" solar farm

Phase Name Location Coordinates (WGS 84)
1 10th Division of 1st Regiment of Xinjiang Production and Construction Corps, Alar City, Xinjiang, China[1] 40.544, 81.352 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240207060614/https://guangfu.bjx.com.cn/news/20230816/1325909.shtml. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240213134221/http://www.dlztb.com/powerec/202201/26700.html. Archived from the original on 13 February 2024. {{cite web}}: Missing or empty |title= (help)