Xinjiang Bingzhun Xinhong power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Xinjiang Bingzhun Xinhong power station (新疆兵准信泓2×600兆瓦高效超超临界空冷抽凝式发电机组, 兵团准东产业园信发集团新疆公司2×60万千瓦煤电机组项目) is an operating power station of at least 1200-megawatts (MW) in Jimsar County, Changji Hui Autonomous Prefecture, Xinjiang, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Xinjiang Bingzhun Xinhong power station | Jimsar County, Changji Hui Autonomous Prefecture, Xinjiang, China | 44.733695, 89.09255 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 44.733695, 89.09255
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: unknown[1] | 600 | ultra-supercritical | 2025 | False |
| Unit 2 | Operating[2][3] | coal: unknown[1] | 600 | ultra-supercritical | 2025[2] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Xinjiang Bingzhun Xinhong Energy Co Ltd [100%] | Xinjiang Bingzhun Xinhong Energy Co Ltd [100.0%] |
| Unit 2 | Xinjiang Bingzhun Xinhong Energy Co Ltd [100%] | Xinjiang Bingzhun Xinhong Energy Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Background
Construction of both units progressed rapidly in 2023 and 2024, with milestones including the chimney and cooling towers.[4][5]
Unit 1 was connected to the grid in December 2024 and entered commercial operation in early 2025.[6][7]
Unit 2 passed its 168-hour trial run in March 2025.[8]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://mp.weixin.qq.com/s/_aWQaXFJEDvNrzCZi7ncdA.
{{cite web}}: Missing or empty|title=(help) - ↑ "烟塔施工分公司新疆兵准信泓电厂烟囱外筒顺利封顶". www.henandr.com.cn. 2023-11-15. Archived from the original on 2024-08-15. Retrieved 2024-08-07.
- ↑ "兵团准东工业园区新疆兵准信泓能源有限责任公司2*600MW电站锅炉机组工程正在加紧建设中". Wujiaqu Municipal Government. 2023-09-28. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "新疆兵准信泓电厂烟囱工程顺利封顶". Henan D.R. Construction Group. 2023-11-14. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "新疆兵准信泓能源有限责任公司两台机组均已投产". Tencent News. 2025-02-13. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "哈电锅炉研制的新疆兵准信泓2×600MW超超临界燃煤发电机组1号锅炉顺利通过168小时满负荷试运行". BeiJiXing (BJX) News. 2025-03-07. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "新疆兵准信泓项目两台机组顺利实现"双投"". WeChat. 2025-03-14. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
