Xinjiang Jinlong cogen power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Xinjiang Jinlong cogen power station (第七师胡杨河市锦鑫电力2×66万千瓦煤电项目, 新疆锦龙2×66万千瓦超超临界热电联产项目) is an announced power station in Wuwu Town, Huyanghe, Ili, Xinjiang, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Xinjiang Jinlong cogen power station | Wuwu Town, Huyanghe, Ili, Xinjiang, China | 44.785631, 84.8847 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 44.785631, 84.8847
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Announced[2] | coal: unknown[3][2] | 660[2] | ultra-supercritical[1] | yes | False |
| Unit 2 | Announced[2] | coal: unknown[1][3] | 660[2] | ultra-supercritical[1] | yes | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Xinjiang Jinlong Electric Power Group Co Ltd [100%][1] | Xinjiang Jinlong Electric Power Group Co Ltd [100.0%] |
| Unit 2 | Xinjiang Jinlong Electric Power Group Co Ltd [100%][1] | Xinjiang Jinlong Electric Power Group Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Feasibility reviews for a 2×660MW ultra-supercritical deep peak-shaving expansion project inside the Shenwu plant site in Huyanghe City were convened in March 2023[4], with engineering design contracts awarded to China Energy Construction Hunan Institute in early 2024[5]. EIA reports and regional emissions reduction mitigation plans were published in August and September 2024[6]. However, due to regional grid capacity changes, the Production and Construction Bureau issued a temporary suspension directive in late 2024, terminating active EPC and supervision bidding. The project was subsequently revived in March 2026, with a new feasibility study bidding tender launched for a modified 2×660MW super-critical layout under the name of Jinxin Electricity[7].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) http://www.nqs.gov.cn/upload/main/contentmanage/article/file/2024/08/09/202408092008490302.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://mp.weixin.qq.com/s/f4uderyIZbYkmpx8MdznkQ.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "新疆锦龙电力集团有限公司清洁煤电新能源深度调峰2×660MW机组可行性研究报告评审会召开". 中国能建湖南院. 2023-03-16. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国能建湖南院中标新疆锦龙清洁煤电新能源深度调峰2×660MW机组工程可研和初步设计". 北极星电力网. 2024-02-29. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "新疆锦龙电力集团有限公司清洁煤电新能源深度调峰2×66万千瓦项目环境影响评价第二次公示". 第七师胡杨河市人民政府. 2024-08-09. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "第七师胡杨河市锦鑫电力2×66万千瓦煤电项目可研招标公告". 微信公众平台. 2026-03-27. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
