Xinjiang Lop (China Energy Investment) solar power plant
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Xinjiang Lop (China Energy Investment) solar power plant is an operating solar photovoltaic (PV) farm in Lop, Hotan Prefecture, Xinjiang, China.
Project Details
Table 1: Phase-level project details for Xinjiang Lop (China Energy Investment) solar power plant
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2023[1] | 200 MWac[2] | PV[2] | State Energy Investmeng Group Xinjiang Energy Co Ltd [90%]; Central Xinjiang Hesheng Silicon Enterprises Co Ltd [5%]; China Anneng Group Number Engineering Bureau Co Ltd [5%] (新疆中部合盛硅业有限公司; 国家能源集团新疆能源有限责任公司; 中国安能集团第三工程局有限公司)[3] | China Energy Investment Luopu Energy (国能洛浦能源有限责任公司)[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Xinjiang Lop (China Energy Investment) solar power plant
Location | Coordinates (WGS 84) |
---|---|
Lop, Hotan Prefecture, Xinjiang, China[4] | 36.9790, 80.3150 (approximate)[4] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240212212602/http://www.xj.chinanews.com.cn/dizhou/2023-02-27/detail-ihckxxnf9469578.shtml. Archived from the original on 2024-02-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20240207062530/http://ggzy.xjht.gov.cn:8081/htggzy/005d06df-5721-433c-a827-d56e7d6a1857/4f5d244b-9111-4c02-ab87-117094c53260/%E5%85%89%E4%BC%8F%E4%B8%AD%E6%A0%87%E5%80%99%E9%80%89%E5%85%AC%E7%A4%BA.pdf. Archived from the original (PDF) on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) http://ggzy.xjht.gov.cn:8081/htggzy/005d06df-5721-433c-a827-d56e7d6a1857/4f5d244b-9111-4c02-ab87-117094c53260/%E5%85%89%E4%BC%8F%E4%B8%AD%E6%A0%87%E5%80%99%E9%80%89%E5%85%AC%E7%A4%BA.pdf, http://ggzy.xjht.gov.cn:8081/htggzy/005d06df-5721-433c-a827-d56e7d6a1857/4f5d244b-9111-4c02-ab87-117094c53260/%E5%85%89%E4%BC%8F%E4%B8%AD%E6%A0%87%E5%80%99%E9%80%89%E5%85%AC%E7%A4%BA.pdf http://ggzy.xjht.gov.cn:8081/htggzy/005d06df-5721-433c-a827-d56e7d6a1857/4f5d244b-9111-4c02-ab87-117094c53260/%E5%85%89%E4%BC%8F%E4%B8%AD%E6%A0%87%E5%80%99%E9%80%89%E5%85%AC%E7%A4%BA.pdf, http://ggzy.xjht.gov.cn:8081/htggzy/005d06df-5721-433c-a827-d56e7d6a1857/4f5d244b-9111-4c02-ab87-117094c53260/%E5%85%89%E4%BC%8F%E4%B8%AD%E6%A0%87%E5%80%99%E9%80%89%E5%85%AC%E7%A4%BA.pdf, http://ggzy.xjht.gov.cn:8081/htggzy/005d06df-5721-433c-a827-d56e7d6a1857/4f5d244b-9111-4c02-ab87-117094c53260/%E5%85%89%E4%BC%8F%E4%B8%AD%E6%A0%87%E5%80%99%E9%80%89%E5%85%AC%E7%A4%BA.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240207061027/http://www.chnenergybidding.com.cn/bidweb/001/001002/001002002/20220620/d89e23b1-bee8-448a-b47d-dad206cf7291.html. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help)