Xinjiang Toli (Goldwind) Experimental wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Xinjiang Toli (Goldwind) Experimental wind farm (金风科技国创中心塔城地区托里县80万千瓦实验风电场项目) is a wind farm under construction in Toli, Tacheng Prefecture, Xinjiang, China.

Project Details

Table 1: Phase-level project details for Xinjiang Toli (Goldwind) Experimental wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Construction[1] 2026 (planned)[2] 800 MW[3] Onshore[3] Xijiang Goldwind Technology Co Ltd (新疆金风科技股份有限公司)[3] Tacheng Goldwind Tianrun Guochuang Experimental Wind Farm (塔城金风天润国创实验风电有限公司)[4]

Location

Table 2: Phase-level location details for Xinjiang Toli (Goldwind) Experimental wind farm

Location Coordinates (WGS 84)
Toli, Tacheng Prefecture, Xinjiang, China[5] 46.1710, 84.5110 (approximate)[5]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://news.bjx.com.cn/html/20251015/1465034.shtml, https://xjtc.gov.cn/ywdt/jrtc/jjdt/content_56470, https://news.bjx.com.cn/html/20231116/1343842.shtml, https://www.xjtl.gov.cn/bzxzf/8440.html, https://mwind.in-en.com/html/wind-2459521.shtml https://wind.in-en.com/html/wind-2462404.shtml, https://news.bjx.com.cn/html/20251015/1465034.shtml, https://xjtc.gov.cn/ywdt/jrtc/jjdt/content_56470, https://news.bjx.com.cn/html/20231116/1343842.shtml, https://www.xjtl.gov.cn/bzxzf/8440.html, https://mwind.in-en.com/html/wind-2459521.shtml. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://xjtc.gov.cn/ywdt/jrtc/jjdt/content_56470 https://news.bjx.com.cn/html/20251015/1465034.shtml, https://xjtc.gov.cn/ywdt/jrtc/jjdt/content_56470. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 "总投资138.41亿!塔城5个风光项目集中开工-北极星风力发电网". news.bjx.com.cn. Archived from the original on 2024-02-19. Retrieved 2024-02-06.
  4. https://www.xjtl.gov.cn/bzxzf/8440.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://news.bjx.com.cn/html/20231116/1343842.shtml https://www.xjtl.gov.cn/bzxzf/8440.html, https://news.bjx.com.cn/html/20231116/1343842.shtml. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)