Xinjiang Turpan Shanshan (State Power Investment) 1000 MW solar power complex
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Xinjiang Turpan Shanshan (State Power Investment) 1000 MW solar power complex is an operating solar photovoltaic (PV) and solar thermal farm in Qiketai, Shanshan, Turpan, Xinjiang, China.
Project Details
Table 1: Phase-level project details for Xinjiang Turpan Shanshan (State Power Investment) 1000 MW solar power complex
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
PV1 | Operating[1] | 2024[1] | 500 MWac[1] | PV[1] | China Power Investment Henan Power Co Ltd (国家电投集团河南电力有限公司)[1] |
PV2 | Construction[2] | – | 400 MW[3] | PV[4] | State Power Investment Group Henan Power Co Ltd [100%] (国家电投集团河南电力有限公司)[4] |
Solar Thermal | Construction[5] | – | 100 MWac[4] | Solar Thermal[4] | State Power Investment Group Henan Power Co Ltd [100%] (国家电投集团河南电力有限公司)[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Xinjiang Turpan Shanshan (State Power Investment) 1000 MW solar power complex
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
PV1 | Qiketai, Shanshan, Turpan, Xinjiang, China[1] | 43.0060, 90.6630 (approximate)[1] |
PV2 | Qiketai, Shanshan, Turpan, Xinjiang, China[3] | 43.0060, 90.6630 (approximate)[3] |
Solar Thermal | Shanshan, Turpan, Xinjiang, China[4] | 43.0060, 90.6632 (approximate)[4] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://business.sohu.com/a/820545185_120093798.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://business.sohu.com/a/820545185_120093798, https://www.sohu.com/a/800617246_120093798, http://www.cnste.org/html/xiangmu/2022/0729/9266.html https://www.bidcenter.com.cn/news-226706511-4.html, https://business.sohu.com/a/820545185_120093798, https://www.sohu.com/a/800617246_120093798, http://www.cnste.org/html/xiangmu/2022/0729/9266.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 http://www.cnste.org/html/xiangmu/2022/0729/9266.html https://business.sohu.com/a/820545185_120093798, http://www.cnste.org/html/xiangmu/2022/0729/9266.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://web.archive.org/web/20240207063218/http://www.cnste.org/html/xiangmu/2022/0729/9266.html. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://www.cnste.org/html/xiangmu/2024/0402/12734.html, https://www.sohu.com/a/778507205_121123906 http://www.cnste.org/html/xiangmu/2022/0729/9266.html,https://www.cspplaza.com/article-22962-1.html, http://www.cnste.org/html/xiangmu/2024/0402/12734.html, https://www.sohu.com/a/778507205_121123906.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)