Xinjiang Xin'an Special Steel Co., Ltd. (新疆新安特钢有限公司) is a 1500 thousand tonnes per annum (TTPA) electric arc furnace (EAF) steel plant operating in Changji AP, Xinjiang, China.

Location

The map below shows the location of the steel plant in Changji AP, Xinjiang, China.

Loading map...
  • Location: Dafeng Town Industrial Park, Hutubi County, Changji Prefecture, Xinjiang Uygur Autonomous Region[1]
  • Coordinates (WGS 84): 44.290299, 86.595826 (exact)

Background

According to the capacity replacement plan, the company plans to build a new 120-tonne electric furnace with a capacity of 400,000 tons in March 2022,[2] which is expected to be completed in September this year, enabling trial production.[3]



Plant Details

Table 1: General Plant Details

Plant status Start date Closed date Workforce size
operating[1] 2011[4] 2023[5] 105[1]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
Xinjiang Xin'an Special Steel Co., Ltd. [100%][1] GEM0000259 [100%] Xinjiang Xin'an Special Steel Co., Ltd.[1] GEM0000259

Table 3: Process and Products

Steel product category Steel products Main production equipment Detailed production equipment
finished rolled[6] round steel, hot-rolled steel bar, cold-rolled (drawn) steel bar, high-speed non-twist rolling mill wire rod[6] electric arc furnace (EAF)[7] 2 EAF (2x75-tonne)[7]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
1500 TTPA[8] 1500 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20220111132421/https://www.qcc.com/firm/90054055d703ff36157ff06b348c86ac.html. Archived from the original on 2022-01-11. {{cite web}}: Missing or empty |title= (help)
  2. 新疆新安特钢建设项目产能置换方案公告,新疆工信厅,November 23, 2021
  3. "全疆最大电炉!日产6000吨钢,年转换电能10000000度!". 网易新闻. 2023-03-08.
  4. https://web.archive.org/web/20220111132421/https://www.qcc.com/firm/90054055d703ff36157ff06b348c86ac.html. Archived from the original on 2022-01-11. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220319193206/https://info.lgmi.com/html/202111/23/3796.htm. Archived from the original on 2022-03-19. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20220120031746/http://192676.fm086.com/Synopsis. Archived from the original on 2022-01-20. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 2022-02-07. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) http://www.xjhbcy.cn/hbcyxh/20221006/%E6%96%B0%E7%96%86%E6%96%B0%E5%AE%89%E7%89%B9%E9%92%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8120t%E7%94%B5%E7%82%89%E4%BA%A7%E8%83%BD%E7%BD%AE%E6%8D%A2%E5%8D%87%E7%BA%A7%E6%94%B9%E9%80%A0%E9%A1%B9%E7%9B%AE%E7%8E%AF%E5%A2%83%E5%BD%B1%E5%93%8D%E6%8A%A5%E5%91%8A%E4%B9%A6%EF%BC%88%E6%8B%9F%E6%8A%A5%E6%89%B9%E7%A8%BF%EF%BC%89_1665063563237.pdf. {{cite web}}: Missing or empty |title= (help)