Xinneng Jining Jinxiang power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Xinneng Jining Jinxiang power station (鑫能济宁新材料产业园2×6万千瓦背压机组, 济宁能源集团金乡热电联产项目) is a power station under construction in Jinxiang, County, Jining, Shandong, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xinneng Jining Jinxiang power station Jinxiang, County, Jining, Shandong, China 35.177207, 116.403343 (approximate)[1]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
Unit 1 Construction[2] coal: unknown[1] 60[1] unknown yes[1] 2026 (planned)[2]
Unit 2 Construction[2] coal: unknown[1] 60[1] unknown yes[1] 2026 (planned)[2]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Jining Xinneng Thermal Power Co Ltd[1] Jining Xinneng Thermal Power Co Ltd
Unit 2 Jining Xinneng Thermal Power Co Ltd[1] Jining Xinneng Thermal Power Co Ltd

Project-level coal details

  • Permit(s): 鲁发改项审【2024】394号[1]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The project passed feasibility report reviews in June 2024 and finalized its initial survey and design contract in August 2024 for a 2×60MW back-pressure field plant utilizing three 440t/h boilers inside Jining New Material Industrial Park, owned by Jining Xinneng Thermal Power Co., Ltd.[3][4]. Following EIA disclosures, the development officially secured its provincial project permit (Lu Fa Gai Xiang Shen [2024] No. 394) in November 2024[5][6]. Final EIA clearances and water permissions were successfully granted in early 2025[7], leading to an official groundbreaking ceremony on March 27, 2025[8], and the successful pouring of the first foundation structural concrete for the main power house on June 2, 2025[9].

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://jiningcoal.com.cn/news/subsidiary/2024/1201_44571.html. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://mp.weixin.qq.com/s/Ke2tIhtF_1JvZVjMWr9QzA. {{cite web}}: Missing or empty |title= (help)
  3. "济宁能源集团金乡热电联产项目可行性研究报告评审会顺利召开". 济宁能源集团. 2024-06-26. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  4. "济宁新材料产业园2×6万千瓦背压机组建设项目勘察设计中标公告". 招标中心. 2024-08-12. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  5. "济宁新材料产业园2×6万千瓦背压机组建设项目环境影响评价公众参与调查公示". 金乡县人民政府. 2024-10-30. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  6. "济宁新材料产业园2×6万千瓦背压机组建设项目正式获得核准批复". 济宁能源集团. 2024-11-28. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  7. "济宁市生态环境局关于济宁新材料产业园2×6万千瓦背压机组建设项目环评批准公告". 济宁市生态环境局. 2025-01-26. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  8. "济宁能源鑫能热电 2×6 万千瓦背压机组建设项目开工仪式举行". 金乡县人民政府. 2025-03-27. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  9. "鑫能热电主厂房基础首方混凝土成功浇筑". 微信公众平台. 2025-06-02. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.