Xishui Erlang power station (国家电投习水二郎电厂) is an operating power station of at least 1320-megawatts (MW) in Erlang, Xishui, Zunyi, Guizhou, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xishui Erlang power station Erlang, Xishui, Zunyi, Guizhou, China 28.163822, 106.352114 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 28.163822, 106.352114

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Operating coal: unknown[2] 660 subcritical 2015 False
Phase I Unit 2 Operating coal: unknown[2] 660 subcritical 2015 False
Phase II Unit 3 Shelved coal: unknown[2][1] 660[1] subcritical[1] 2020 (planned) False
Phase II Unit 4 Shelved coal: unknown[2][1] 660[1] subcritical[1] 2020 (planned) False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guizhou Xishui Dingtai Energy Development Co Ltd [100%][1] State Power Investment Corp Ltd [63.2%]; Xuzhou Coal Mining Group Corp [24.7%]; China International Water and Power Singapore Corp [8.2%]; unknown [3.9%]
Phase I Unit 2 Guizhou Xishui Dingtai Energy Development Co Ltd [100%][1] State Power Investment Corp Ltd [63.2%]; Xuzhou Coal Mining Group Corp [24.7%]; China International Water and Power Singapore Corp [8.2%]; unknown [3.9%]
Phase II Unit 3 Guizhou Xishui Dingtai Energy Development Co Ltd [100%][1] State Power Investment Corp Ltd [63.2%]; Xuzhou Coal Mining Group Corp [24.7%]; China International Water and Power Singapore Corp [8.2%]; unknown [3.9%]
Phase II Unit 4 Guizhou Xishui Dingtai Energy Development Co Ltd [100%][1] State Power Investment Corp Ltd [63.2%]; Xuzhou Coal Mining Group Corp [24.7%]; China International Water and Power Singapore Corp [8.2%]; unknown [3.9%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Financing

  • Source of financing: CPI, Guizhou Industrial Investment Group, Xuzhou Coal Mining Group, Chongqing Longdian Industrial Development, Xishui National Property Investment[3]

Background on Project

CPI is planning to build a four-unit coal-fired power plant with a total planned capacity of 2,640 MW in Guizhou Province. All the electricity Erlang Power Station generates will supply Chongqing City.[4][3][5]

The trial run for unit 1 was completed in October 2015. Unit 2 began operating in December 2015.[6][7][8]

Development of Units 3 and 4

Units 3-4 were permitted for construction in July 2014,[9][10] but construction never began.

In July 2019, Units 3-4 were listed as "key projects for clean electricity in Guizhou Province", with a planned operation of 2020.[11] However, satellite photos through July 2019 show no signs of construction. Units 3-4 were listed in Guizhou Province's 14th Five Year Plan (2021-2025), suggesting the province still intends to move forward with them. With the original 2014 permission having expired, the two units were considered to have returned to "pre-permit development" in 2021-2023.

No news was found for Phase II Unit 3 in 2023[12]. In April 2024, the project was not on the provincial key projects list and was marked as shelved[13]. No revival news emerged in 2025–2026[14].

Ownership

In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[15]

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://news.bjx.com.cn/html/20140813/536521.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 "习水二郎电厂,", 新遵义网, 1/15/2013
  4. ↑ "习水二郎火电厂4×660MW工程可研报告通过专家审查," accessed June 2013
  5. ↑ "中电投习水二郎电厂3、4号机组新建工程项目获核准,", 北极星电力网, 8/13/2014
  6. ↑ "贵州省环境工程评估中心受邀参加“习水二郎电厂(4×660MW)新建工程3、4号机组”环境影响技术评估会,", 贵州省环境保护厅, 10/08/2013
  7. ↑ "习水二郎电厂1、2号机组实现并网发电," www.seely.com, January 12, 2016
  8. ↑ "贵州习水二郎电厂1号机组通过168小时试运行," 中国能建, 2015-10-27
  9. ↑ "习水能源公司招聘公告," SPIC, August 31, 2016
  10. ↑ "江西水电中标习水二郎电厂3、4号机组桩基工程"江西水电, 2016-05-19
  11. ↑ "贵州省清洁电力重点项目名单发布:2022年60万级以上煤电机组装机占比将达65%," 北极星电力网新闻中心, 2019/7/30
  12. ↑ "习水二郎电厂二期无新进展". 北极星电力网. 2023-10-24. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "习水二郎电厂二期项目搁置". 北极星电力网. 2024-04-03. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "习水二郎电厂二期仍无复工消息". 北极星电力网. 2025-10-29. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.