YK Steel Busan plant

From Global Energy Monitor
(Redirected from YK Steel plant)
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

YK Steel Busan plant (YK스틸 (Korean)), also known as Kukdong Steel Industry (predecessor), Kumho Industry (predecessor), Hanbo Iron & Steel (predecessor), is an electric arc furnace (EAF) steel plant operating in Busan, South Gyeongsang, South Korea.

Location

The map below shows the exact location of the plant in Busan, South Gyeongsang, South Korea:

Loading map...
  • Location: 760, Eulsukdo-daero, Saha-gu, Busan, 49456, Republic of Korea
  • Coordinates (WGS 84): 35.083819, 128.989034 (exact)

Background

Kukdon Steel Industry was founded un August 1958 and relocated to the current site in Busan in December 1966. The company became YK Steel Corp in December 2002.[1] In 2020, Daehan Steel acquired the steel manufacturing facilities and sales business, while the Yamato Kogyo Group maintains ownership of the land for the Busan plant.[2][3] Daehan Steel acquired 51% stake in YK Steel Corp by September 2020[4] and increased its stake to 70% by August 2021.[5]

Given the development of the area to a residential area, there were plans to relocate the plant to Dangjin. In January 2022, an agreement was signed between the company and German engineering firm SMS group for development of Dangjin plant with new equipment provided by SMS group.[6] Reports suggest that the company has decided against relocating the Busan plant and has decided to build a completely new plant at the Dangjin site.[7][8]

Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size
Operating[9] 1966[10] 336[11]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Daehan Steel Co Ltd [70.0%]; Yamato Kogyo Co Ltd [30.0%] 4295882647 [70%]; 4295878941 [30%] E100001010335 [70%]; E100001010196 [30%] YK Steel Corp[11] 5044252671 E100000131021

Table 3: Process and Products

Steel product category Steel products Steel sector end users Main production equipment Detailed production equipment
semi-finished; finished rolled[11] rebar, billet[11] building and infrastructure[11] EAF[10] 2 EAF (1x30-tonne began in 1974, 1x70-tonne began in 1980)[12]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 2110 TTPA[11][11] 2110 TTPA[11][11]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. "::YK Steel::세계로 뻗어가는 YK Steel입니다". www.yk-steel.co.kr. Retrieved 2023-12-06.
  2. Kim, Maru (2023-03-25). "YK Steel's Busan Plant Site: A Potential Residential Development in the Making". Breeze In Busan. Retrieved 2023-12-07.
  3. "South Korea's Daehan formalizes SMS deal for Dangjin works | SEAISI". www.seaisi.org. Retrieved 2023-12-07.
  4. MarketScreener (2020-09-08). "Daehan Steel Co., Ltd. completed the acquisition of 51% stake in steel products manufacturing and sales business of YK Steel Corp. -September 07, 2020 | MarketScreener". www.marketscreener.com. Retrieved 2023-12-07.
  5. MarketScreener (2021-08-02). "Daehan Steel Co., Ltd. agreed to acquire an additional 11.8% stake in YK Steel Corp. -August 01, 2021 | MarketScreener". www.marketscreener.com. Retrieved 2023-12-07.
  6. "South Korea's Daehan formalizes SMS deal for Dangjin works | SEAISI". www.seaisi.org. Retrieved 2023-12-07.
  7. "South Korea's YK Steel invests in new rebar mill". www.steelorbis.com. Retrieved 2023-12-07.
  8. "YK Steel Turns to SMS group for Rebar Mill". AIST. 13 February, 2023. Retrieved 07 December, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  9. https://web.archive.org/web/20220112202530/http://www.yk-steel.co.kr/eng2/?target_page. Archived from the original on 12 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20220114114117/http://www.yk-steel.co.kr/eng2/?target_page. Archived from the original on 14 January 2022. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 https://web.archive.org/web/20220112163746/http://www.yk-steel.co.kr/eng2/?target_page. Archived from the original on 12 January 2022. {{cite web}}: Missing or empty |title= (help)
  12. https://web.archive.org/web/20220124104121/http://www.yk-steel.co.kr/eng2/?target_page. Archived from the original on 24 January 2022. {{cite web}}: Missing or empty |title= (help)