Yancheng Binhai Port power station is an operating power station of at least 1320-megawatts (MW) in Xieqiao, Jingjiang, Taizhou, Jiangsu, China with multiple units, some of which are not currently operating. It is also known as 江苏国信靖江发电有限公司一期项目; Jiangsu Guoxin Jingjiang power station (Unit 1, Unit 2), 江苏国信靖江发电有限公司二期项目 (Unit 3, Unit 4).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Yancheng Binhai Port power station | Xieqiao, Jingjiang, Taizhou, Jiangsu, China | 32.030487, 120.383144 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 3, Unit 2, Unit 1, Unit 4: 32.030487, 120.383144
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Unit 3 | permitted | coal - bituminous | 1000 | ultra-supercritical | – | – |
Unit 2 | operating | coal - bituminous | 660 | ultra-supercritical | 2014 | – |
Unit 1 | operating | coal - bituminous | 660 | ultra-supercritical | 2013 | – |
Unit 4 | permitted | coal - bituminous | 1000 | ultra-supercritical | – | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 3 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100.0%] |
Unit 2 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100.0%] |
Unit 1 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100.0%] |
Unit 4 | Jiangsu Guoxin Jingjiang Power Generation Co Ltd [100.0%] |
Project-level coal details
- Permit(s): 2015, June 30, 2023
Background on Project
China Datang is planning to build a cogeneration coal-fired power plant with a total planned capacity of 700 MW in Shaanxi Province. The environmental impact assessment was approved in March 2014.[1]
The power station is under construction and planned for operation in 2017.[2]
Unit 1 was commissioned in December 2017.[3]
As of May 2018 Unit 2 has been completed but is waiting for a permit to be commissioned.[4] Unit 2 was commissioned in July 2018.[5]
Articles and Resources
References
- ↑ "关于大唐延安发电厂2×350MW“上大压小”热电联产工程环境影响报告书的批复", 中华人民共和国环境保护部, 环审[2014]35号, 2014-03-11
- ↑ "全面贯彻中央精神 认真履行央企职责 大唐延安热电联产新建工程积极推进," China Datang website, 2015-08-13
- ↑ "大唐延安热电厂1号机组顺利通过168小时试运行," 上海电建, 2017-12-21
- ↑ "陆治原到延安热电厂调研," Datang Shaanxi, 2018-05-28