Yancheng Binhai power station (国电投滨海发电厂) is an operating power station of at least 4000-megawatts (MW) in Binhai Port District, Binhai County, Yancheng, Jiangsu, China with multiple units, some of which are not currently operating. It is also known as 国家电投协鑫滨海发电厂(Phase I), 国电投滨海2×100万千瓦扩建项目 (Phase III), 江苏国信滨海港发电有限公司 (Phase II).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Yancheng Binhai power station | Binhai Port District, Binhai County, Yancheng, Jiangsu, China | 34.307421, 120.246943 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 34.307421, 120.246943
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown[1] | 1000 | ultra-supercritical | 2017 | False |
| Phase I Unit 2 | Operating | coal: unknown[1] | 1000 | ultra-supercritical | 2017 | False |
| Phase II Unit 3 | Operating[2] | coal: unknown[1] | 1000 | ultra-supercritical | 2024 | False |
| Phase II Unit 4 | Operating[3] | coal: unknown[1] | 1000 | ultra-supercritical | 2025 | False |
| Phase III Unit 5 | Construction[4] | coal: unknown[1][5] | 1000[5] | ultra-supercritical[5] | – | False |
| Phase III Unit 6 | Construction[4] | coal: unknown[1][5] | 1000[5] | ultra-supercritical[5] | – | False |
| Phase IV Unit 7 | Pre-permit[6][7] | coal: unknown[6][1] | 1000[6] | ultra-supercritical[6] | – | False |
| Phase IV Unit 8 | Pre-permit[6][7] | coal: unknown[6][1] | 1000[6] | ultra-supercritical[6] | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase I Unit 2 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase II Unit 3 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase II Unit 4 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase III Unit 5 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase III Unit 6 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase IV Unit 7 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
| Phase IV Unit 8 | State Power Investment Group GCL Binhai Power Generation Co Ltd [100%] | Zhongneng Power (Suzhou) Co Ltd [49.0%]; Shanghai Electric Power Co Ltd [45.3%]; Industrial and Commercial Bank of China Ltd [5.7%] |
Project-level coal details
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Phase I
Yancheng Binhai power station (formerly referenced as CPI Binhai Power Station) was proposed as a two-unit project for the Binhai Port District by China Power Investment Corporation (now State Power Investment Corporation) and GCL Poly Energy Holdings.[9]
Construction began in September 2015.[10]
Unit 1 was commissioned in September 2017,[11] and unit 2 in November 2017.[12]
Phase II
In February 2023, Phase II had reportedly entered construction.[13] Planet imagery between January 2023 and August 2023 showed that construction work was taking place at the site. Welding of the boiler "three devices" began in October[14], and the boiler beam was hoisted in November[15].
In 2024, the chimney outer cylinder was completed in January[16], the low-pressure heater was installed in April[17], the intermediate and high-pressure cylinders were hoisted in May[18], the boiler hydraulic test passed in July[19], the turbine cover was completed in July[20], and the unit was connected to the grid in November[21].
In December 2024, the unit passed the 168-hour trial and entered commercial operation[22].
Phase III
In January 2023, the Jiangsu Provincial Development and Reform Commission was also considering an additional 2 x 1,000 MW coal-fired power expansion, known as Phase III, at Yancheng Binhai power station.[23][24]
In June 2023, a water use and impact report was available.[25]
On 8 August 2023, the Jiangsu Provincial Development and Reform Commission approved the two 1,000 MW units (苏发改能源发〔2023〕837号).[26][27][28]
Phase III Unit 5 was granted a "road permit" in September 2023[29], the EIA report was submitted[30], and EPC general contracting was tendered in December[31]. In February 2024, the construction commencement ceremony was held[32], and main machinery contracts were awarded in March[33]. Piling work began in June[34]. Boiler steel frame hoisting began in November 2024[35].
In 2025, the deaerator was installed in August[36].
In June 2026, the unit was connected to the grid[37] and passed the 168-hour trial in July[38].
Phase IV
Unit 7 was on Jiangsu's 15th Five-Year Plan project list in January 2025[39]. In May 2026, feasibility study and technical consulting services were tendered[40], the social stability risk assessment was publicized in June[41], and the feasibility study consulting contract was won by Jiangsu Electric Power Design Institute[42].
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[43]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ https://news.bjx.com.cn/html/20241211/1416204.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://news.bjx.com.cn/html/20250416/1437125.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://news.bjx.com.cn/html/20240624/1384697.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 "国电投滨海2×100万千瓦扩建项目喜获核准!-北极星火力发电网". news.bjx.com.cn. 2023-08-14. Archived from the original on 2024-01-25. Retrieved 2023-10-24.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://news.bjx.com.cn/html/20250122/1424200.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://news.bjx.com.cn/html/20260608/1498940.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "疯狂煤电又来了!总投资81.84亿元!2×1000MW!京能涿州扩建项目初设评审会招开!2×1000MW!国电投滨海项目核准!". Weixin Official Accounts Platform. 2023-08-14. Archived from the original on 2024-01-25. Retrieved 2023-10-24.
- ↑ "2015年6月2日拟对建设项目环评文件作出审批意见的公告," Environmental Protection Department of Jiangsu Province, 2015-06-02
- ↑ "中电投协鑫滨海2×1000MW发电工程正式开工," 2015-9-21
- ↑ "国家电投集团协鑫滨海发电有限公司1号发电机组正式投入商业运营," 滨海发电公司 时, 2017-9-11
- ↑ "中国能源报:国家电投协鑫滨海发电项目实现双投," 中国能源报, 2017.11.21
- ↑ https://www.prcvalve.com/PC/NewsDet-45595.html, prcvalve.com, 2023-02-10
- ↑ "国信滨海港项目锅炉三器开始焊接". 微信公众平台. 2023-11-10. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目3号锅炉大板梁吊装". 微信公众平台. 2023-12-13. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目烟囱外筒结构施工到顶". 微信公众平台. 2024-04-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目3号机组低压加热器穿装就位". 微信公众平台. 2024-04-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目3号机组中压缸、高压缸吊装就位". 微信公众平台. 2024-06-12. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目3号锅炉整体水压试验一次成功". 北极星电力网. 2024-07-16. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目3号汽轮机扣盖完成". 微信公众平台. 2024-08-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港项目3号机组首次并网一次成功". 北极星电力网. 2024-12-03. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信滨海港3号机组通过168小时试运行正式投产". 北极星电力网. 2024-12-11. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ 江苏省“先立后改”煤电支撑性电源项目(第二批)规划建设实施方案公示, BJX, 2023-01-16
- ↑ 国家电投滨海三期2×100万千瓦扩建项目获前期发展路条, news.bjx.com, 2023-02-09
- ↑ 【项目】火电|2×1000MW!国电投滨海扩建水资源专题论证过审!/2×1000MW!华润电力蒲圻三期举行主厂房浇筑仪式, mp.weixin.qq.com, 2023-06-06
- ↑ "国电投滨海2x100万千瓦扩建项目". 江苏省发展和改革委员会. 2023-08-08. Retrieved 2023-09-15.
{{cite web}}: CS1 maint: url-status (link) - ↑ 国家电投江苏公司 作者:余德雷 (2023-08-14). "国电投滨海2×100万千瓦扩建项目喜获核准!". 北极星火力发电网. Retrieved 2023-9-15.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国电投滨海2×100万千瓦扩建项目喜获核准批复". 火电之声. 2023-08-13. Retrieved 2023-9-15.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国电投滨海2×100万千瓦扩建项目核准". 微信公众平台. 2023-09-15. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海三期EIA报告" (PDF). 滨海县人民政府. 2023-09-30. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投2×1000MW燃煤发电机组EPC招标". 微信公众平台. 2023-12-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海2×100万千瓦扩建项目开工". 北极星电力网. 2024-02-02. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海项目锅炉、汽轮发电机组设备采购中标". 北极星电力网. 2024-04-03. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海项目主厂房桩基施工开工". 北极星电力网. 2024-06-24. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "滨海项目5号锅炉钢架开始吊装". 微信公众平台. 2024-11-26. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海项目5号机组除氧器吊装就位". 微信公众平台. 2025-08-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海项目5号机组首次并网成功". 微信公众平台. 2026-06-29. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国电投滨海项目5号机组通过168小时试运行". 微信公众平台. 2026-07-14. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江苏省十五五煤电项目优选排序结果公示". 江苏省发改委. 2025-01-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国家电投滨海四期2×1000MW燃煤发电项目可行性研究招标". 微信公众平台. 2026-05-22. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国家电投滨海四期2×1000MW项目社会稳定风险评估公示". 北极星电力网. 2026-06-08. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "江苏院中标国家电投滨海四期2×1000MW项目可研咨询". 微信公众平台. 2026-06-17. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.