Yangcheng power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Yangcheng power station (山西阳城发电厂) is an operating power station of at least 3300-megawatts (MW) in Beiliu, Yangcheng, Jincheng, Shanxi, China with multiple units, some of which are not currently operating. It is also known as 大唐阳城电厂.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yangcheng power station Beiliu, Yangcheng, Jincheng, Shanxi, China 35.466123, 112.5742039 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase I Unit 3, Phase I Unit 4, Phase I Unit 5, Phase I Unit 6, Phase II Unit 7, Phase II Unit 8, Phase III Unit 10, Phase III Unit 9: 35.466123, 112.5742039

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase I Unit 1 Operating coal: anthracite[2] 350 subcritical yes 2001 False
Phase I Unit 2 Operating coal: anthracite[2] 350 subcritical yes 2001 False
Phase I Unit 3 Operating coal: anthracite[2] 350 subcritical yes 2001 False
Phase I Unit 4 Operating coal: anthracite[2] 350 subcritical yes 2002 False
Phase I Unit 5 Operating coal: anthracite[2] 350 subcritical yes 2002 False
Phase I Unit 6 Operating coal: anthracite[2] 350 subcritical yes 2002 False
Phase II Unit 7 Operating coal: anthracite[2] 600 subcritical yes 2007 False
Phase II Unit 8 Operating coal: anthracite[2] 600 subcritical yes 2007 False
Phase III Unit 10 Pre-permit[3] coal: anthracite[2] 1000[1] ultra-supercritical[4] – – False
Phase III Unit 9 Pre-permit[1] coal: anthracite[2] 1000[1] ultra-supercritical[3] – – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase I Unit 2 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase I Unit 3 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase I Unit 4 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase I Unit 5 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase I Unit 6 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase II Unit 7 Datang Yangcheng Power Generation Co Ltd [100%] China Datang Corp Ltd [41.0%]; Jiangsu Guoxin Investment Group Ltd [30.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [12.3%]; KEPCO Shanxi International [9.9%]; Electric Power Development Co Ltd [2.0%]; Shanxi Gemeng International Energy Group Co Ltd [1.4%]; KEPCO Woori Sprott Global Private Equity Fund [1.2%]; Korea Electric Power Corp [1.2%]; unknown [1.2%]
Phase II Unit 8 Datang Yangcheng Power Generation Co Ltd [100%] China Datang Corp Ltd [41.0%]; Jiangsu Guoxin Investment Group Ltd [30.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [12.3%]; KEPCO Shanxi International [9.9%]; Electric Power Development Co Ltd [2.0%]; Shanxi Gemeng International Energy Group Co Ltd [1.4%]; KEPCO Woori Sprott Global Private Equity Fund [1.2%]; Korea Electric Power Corp [1.2%]; unknown [1.2%]
Phase III Unit 10 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]
Phase III Unit 9 Yangcheng International Power Generating Co Ltd [100%] China Datang Corp Ltd [38.7%]; Jiangsu Guoxin Investment Group Ltd [26.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [9.0%]; KEPCO Shanxi International [7.3%]; China Energy Construction Group Co Ltd [6.7%]; Power Construction Corporation of China Ltd [6.7%]; Electric Power Development Co Ltd [1.5%]; Shanxi Gemeng International Energy Group Co Ltd [1.0%]; KEPCO Woori Sprott Global Private Equity Fund [0.9%]; Korea Electric Power Corp [0.9%]; unknown [0.9%]

Project-level coal details

  • Coal source(s): domestic

Background

Yangcheng power station is an eight-unit coal-fired power station totaling 3,300 MW. It was built in 2001 to 2007, and is majority-owned by China Datang.[5]

The plant is the site of the world's two largest dry cooling towers for its 2×600MW phase 2 units.[6]

In November 2023, a 2 x 1,000 MW Phase III was announced at Yangcheng power station.[7]

Phase III Unit 9 had project coordination meetings held in November 2023[8] and the social stability risk assessment was publicized[9]. In December 2023, a project promotion meeting was held[10]. In February 2024, another project promotion meeting was held[11]. No news emerged for several months. A further meeting was held in November 2024 to push for project approval[12]. In 2025, a transmission planning study was tendered in March[13] and a project promotion meeting was held in July[14]. The EIA was publicly notified in October[15]. In February 2026, the EIA was approved by the provincial authorities[16].

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 "大唐阳城电厂三期2×1000MW煤电项目调度会顺利召开". Weixin Official Accounts Platform. 2023-11-23. Archived from the original on 2024-01-25. Retrieved 2023-12-04.
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 "公示公告-阳城县人民政府". www.yczf.gov.cn. 2023-11-19. Archived from the original on 2024-01-25. Retrieved 2023-12-04.
  4. ↑ "大唐阳城2×1000MW煤电项目社会稳定风险评估公示-北极星火力发电网". news.bjx.com.cn. 2023-11-20. Archived from the original on 2024-01-25. Retrieved 2023-12-04.
  5. ↑ "阳城电厂," Baidu, accessed Nov 2016
  6. ↑ "Yangcheng Coal-Fired Power Plant" (PDF). 2018-06-11. Retrieved 2021-01-02.
  7. ↑ 大唐阳城电厂三期2×1000MW煤电项目调度会顺利召开, mp.weixin.qq.com, November 22, 2023
  8. ↑ "大唐阳城电厂三期2×1000MW煤电项目调度会". 微信公众平台. 2023-11-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "大唐阳城2×1000MW煤电项目社会稳定风险评估公示". 阳城县人民政府. 2023-11-19. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "大唐阳城2×1000MW煤电项目工作推进会议". 北极星电力网. 2023-12-21. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "阳泉县召开大唐阳城2×1000MW煤电项目推进会". 北极星电力网. 2024-03-04. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "大唐阳城2×1000MW煤电项目推进会". 阳城县人民政府. 2024-11-26. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "大唐阳城2×1000MW煤电项目输电规划研究招标". 北极星电力网. 2025-03-03. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "大唐阳城2×1000MW煤电项目推进会召开". 北极星电力网. 2025-07-14. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "大唐阳城2×1000MW煤电项目EIA受理公示". 微信公众平台. 2025-12-08. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "大唐阳城2×1000MW煤电项目EIA审批决定公告". 微信公众平台. 2026-04-10. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)