Yangjiang LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Yangjiang LNG Terminal (阳江LNG调峰储气库)is a proposed LNG terminal in Yangjiang, Guangdong, China.

Location

Loading map...

Project Details

  • Sponsor: Guangdong Yangjiang Hailing Bay LNG Co., Ltd. 广东阳江海陵湾液化天然气有限责任公司[1]
  • Owner: Guangdong Energy Group Natural Gas Co., Ltd. 50%, Pacific Oil & Gas Co., Ltd. 50%.
  • Parent: Guangdong Energy Group, Royal Golden Eagle Group
  • Location: Yangjiang, Guangdong, China
  • Coordinates: 21.674822, 111.831709 (exact)
  • Capacity: 2.8 mtpa
  • Status: Construction
  • Type: Import
  • Start Year: 2023

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

The project was announced in September 2018 as a joint venture between Yudean and Royal Golden Eagle.[2] The construction of land reclaim from the sea began in February 2018. The extimated investment was 4.5 billion yuan ($685 million). [2]

A ground breaking ceremony was held in August 2019. The receiving capacity was reportedly 2.8 mtpa.[3][4]

Articles and resources

References

  1. "广东阳江海陵湾液化天然气有限责任公司-企查查". www.qcc.com. Retrieved 2021-03-31.
  2. 2.0 2.1 粤电集团主导首个LNG接收站开工,定位“来料加工”全面对外开放, news.qq.com, Sep. 2, 2018
  3. "金鹰集团助力中国天然气资源供应-新闻-能源资讯-中国能源网". www.china5e.com. Retrieved 2021-03-31.
  4. "阳江 LNG 调峰储气库项目举行奠基仪式" (PDF). www.rgei.com/. 2019-08-28.

Related GEM.wiki articles

External resources

External articles