Yangzhou Chemical Industrial Park power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Yangzhou Chemical Industrial Park power station (华电江苏仪征热电公司扬州化学工业园区热电厂) is a power station under construction in Qingshan Town, Yizheng, Yangzhou, Jiangsu, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yangzhou Chemical Industrial Park power station Qingshan Town, Yizheng, Yangzhou, Jiangsu, China 32.278886, 119.09288 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 32.278886, 119.09288

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 construction coal - unknown 50 unknown
Unit 2 construction coal - unknown 50 unknown

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Jiangsu Huadian Yizheng Thermal Power Co Ltd [100.0%]
Unit 2 Jiangsu Huadian Yizheng Thermal Power Co Ltd [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): chemicals
  • Captive industry: Both

Project-level coal details

  • Permit(s): December 26, 2019

Background

The Yangzhou Chemical Industrial Park power station was proposed in December 2018 by the Yangzhou Chemical Industrial Park facility and approved by Jiangsu province’s Department of Ecology and Environment in November 2019.[1][2] With an initial investment of 1.5 billion RMB, the power station was planned to begin operation in March 2021; however, as of June 2021, construction has yet to begin.[1][2][3]

In December 2019, the Yangzhou Chemical Industry Park held a press conference on gas coal substitution for its facilities; however, it dit not look like that had affected the construction or fuel of the upcoming power plant.[4]

Construction began in August 2022.[5]

Articles and Resources

References

  1. 1.0 1.1 "总投资15亿元 江苏华电扬州化工园区热电联产项目签约_仪征". Sohu News. 2018-12-17. Retrieved 2021-06-14.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 "江苏省生态环境厅环评审批省生态环境厅关于江苏华电扬州化学工业园区热电联产项目环境影响报告书的批复". Department of Ecology and Environment - Jiangsu Province. 2019-11-20. Retrieved 2021-06-14.{{cite web}}: CS1 maint: url-status (link)
  3. "江苏华电扬州化学工业园项目环评公众参与说明 - 百度文库". Baidu (in 中文). 2019-10-30. Retrieved 2021-06-14.{{cite web}}: CS1 maint: url-status (link)
  4. "中国扬州门户网站群-政府信息公开". Yangzhou Gov. 2019-12-30. Retrieved 2021-06-14.{{cite web}}: CS1 maint: url-status (link)
  5. 江苏华电仪化热电主体工程开工, BJX, 2022-08-31

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.