Yellow Pine Solar Project
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Yellow Pine Solar Project is an operating solar photovoltaic (PV) farm in Clark County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Yellow Pine Solar Project
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|---|
| 1 | Operating[1] | 2023[2] | 125 MWac[2] | PV[3] | NextEra Energy Inc [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Yellow Pine Solar Project
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Clark County, Nevada, United States[2] | 36.0661, -115.7751 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240201195805/https://svcleanenergy.org/news/central-coast-community-energy-and-silicon-valley-clean-energy-announce-commissioning-of-new-large-scale-solar-and-energy-storage-project/. Archived from the original on 2024-02-01.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 3.0 3.1 https://web.archive.org/web/20240207130103/https://www.nexteraenergyresources.com/yellow-pine-solar/project-overview.html. Archived from the original on 2024-02-07.
{{cite web}}: Missing or empty|title=(help)
