Yichang Xiaoting power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Yichang Xiaoting power station (华润电力宜昌发电厂) is an operating power station of at least 700-megawatts (MW) in Xiaoting Industrial Park, Xiaoting, Yichang, Hubei, China with multiple units, some of which are not currently operating. It is also known as 华润猇亭热电联产项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Yichang Xiaoting power station | Xiaoting Industrial Park, Xiaoting, Yichang, Hubei, China | 30.496979, 111.441912 (exact) |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Unit 1, Unit 2: 30.496979, 111.441912
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase II Unit 3 | Construction[1] | coal: unknown[2][3] | 350[3] | unknown[3] | yes[3] | 2026 (planned) | False |
| Unit 1 | Operating | coal: unknown[2] | 350 | supercritical | yes | 2014 | False |
| Unit 2 | Operating | coal: unknown[2] | 350 | supercritical | yes | 2014 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase II Unit 3 | Cr Power (Yichang) Co Ltd [100%] | China Resources Power Holdings Co Ltd [100.0%] |
| Unit 1 | Cr Power (Yichang) Co Ltd [100%] | China Resources Power Holdings Co Ltd [100.0%] |
| Unit 2 | Cr Power (Yichang) Co Ltd [100%] | China Resources Power Holdings Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
China Resources proposed a two-unit coal-fired power plant with a total planned capacity of 700 MW in Hubei Province. The plant went online in 2014.[4]
Phase II Unit 3 was approved in March 2023[5] and a project management tender was issued in November[6]. In 2024, construction began in September[7], and various tenders were issued[8]. Significant construction progress was observed in satellite imagery through 2025[9].
In July 2026, the unit passed the 168-hour trial[10].
Articles and Resources
References
- ↑ https://mp.weixin.qq.com/s/YmhudcvM2BTNC5RH8ayftA.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://mp.weixin.qq.com/s/LXVZ1rqr_7HA55vVhZPi6A.
{{cite web}}: Missing or empty|title=(help) - ↑ "华润宜昌热电项目全面投产", 华润(集团)有限公司, 来源:三峡日报, 2014-06-03
- ↑ "华润电力(宜昌)二期1×350MW项目核准" (PDF). 电力周刊. 2023-03-15. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润宜昌二期1×350MW项目工程监理中标". 微信公众平台. 2024-01-08. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润宜昌1×350MW项目主体安装施工招标". 北极星电力网. 2024-08-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润宜昌二期项目14项中标公示". 北极星电力网. 2024-06-25. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "宜昌火电二期项目施工进展显著". 北极星电力网. 2025-07-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润宜昌热电联产二期3号机组通过168小时试运行". 北极星电力网. 2026-07-27. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.