Yiyang power station (陕煤化长安益阳发电厂) is an operating power station of at least 1920-megawatts (MW) in Lichanggang, Heshan, Yiyang, Hunan, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yiyang power station Lichanggang, Heshan, Yiyang, Hunan, China 28.5966667, 112.2686111 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 28.5966667, 112.2686111

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - anthracite 330 subcritical 2000
Phase I Unit 2 operating coal - anthracite 330 subcritical 2001
Phase II Unit 3 operating coal - anthracite 630 supercritical 2007
Phase II Unit 4 operating coal - anthracite 630 supercritical 2008
Phase III Unit 5 construction coal - anthracite 1000 ultra-supercritical
Phase III Unit 6 construction coal - anthracite 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Chang'an Yiyang Power Generation Co Ltd [100.0%]
Phase I Unit 2 Chang'an Yiyang Power Generation Co Ltd [100.0%]
Phase II Unit 3 Chang'an Yiyang Power Generation Co Ltd [100.0%]
Phase II Unit 4 Chang'an Yiyang Power Generation Co Ltd [100.0%]
Phase III Unit 5 Chang'an Yiyang Power Generation Co Ltd [100.0%]
Phase III Unit 6 Chang'an Yiyang Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): December 30, 2021

Background

Yiyang power station was originally a four-unit coal-fired power plant with a total capacity of 1,920 MW. The plant was completed between 2000 and 2008, and is majority-owned by Shaanxi Coal and Chemical Industry Group.[1][2]

Expansion

In July 2019, it was reported that a 2 x 1,000 MW expansion at the power station was planned and included in the "14th Five-Year Plan for Electric Power Development" of Hunan Province (2021-2025). Pre-feasibility studies were underway.[3] 

According to a job announcement, the units were permitted on December 30, 2021.[4]

Construction reportedly began on July 25, 2022.[5]

Articles and Resources

References

  1. Yiyang Powerplant, Enipedia, accessed Sept. 2015.
  2. "陕煤化集团顺利完成益阳发电公司产权管理权交接," Shaanxi Coal and Chemical Industry Group, 2014-01-09
  3. "2×1000MW+4×660MW!两个大型火电项目获湖南省能源局“路条”," 北极星电力网新闻中心, 2019/7/29
  4. 长安电力华中发电有限公司2022年招聘会, 长安电力华中发电有限公司, 2022-05-24
  5. 2×100万千瓦!益阳电厂三期正式开工, BJX, 2022-07-25

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.