Yongji power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Yongji power station (永济发电厂) is an operating power station of at least 1300-megawatts (MW) in Zhongshan East Street, Yongji, Yuncheng, Shanxi, China with multiple units, some of which are not currently operating. It is also known as 晋能控股永济热电 (Unit 2, Unit 3, Unit 4, Unit 5, Unit 6), Tongmei Yongji power station, 蒲州热电厂 (New unit 3, New unit 4), 晋能控股漳泽电力蒲州发电厂 (New unit 1, New unit 2, New unit 3, New unit 4), 蒲光电厂一期 (New unit 1, New unit 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yongji power station Zhongshan East Street, Yongji, Yuncheng, Shanxi, China 34.8559852, 110.4706728 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • New unit 1, New unit 2, New unit 3, New unit 4, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 34.8559852, 110.4706728

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year Emergency/Backup
New unit 1 Operating coal: bituminous[1] 300 subcritical yes 2006 – False
New unit 2 Operating coal: bituminous[1] 300 subcritical yes 2007 – False
New unit 3 Operating coal: bituminous[1] 350 supercritical yes 2015 – False
New unit 4 Operating coal: bituminous[1] 350 supercritical yes 2016 – False
Unit 2 Retired coal: unknown[1] 100 unknown yes 2004 2007 False
Unit 3 Retired coal: bituminous[1] 50 subcritical yes 1988 2011 False
Unit 4 Retired coal: bituminous[1] 50 subcritical yes 1989 2011 False
Unit 5 Retired coal: unknown[1] 50 unknown yes 1990 2007 False
Unit 6 Retired coal: unknown[1] 50 unknown yes 1999 2007 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
New unit 1 Jinkong Electric Power Puzhou Thermal Power Shanxi Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [65.0%]; Shaanxi Coal and Chemical Industry Co Ltd [35.0%]
New unit 2 Jinkong Electric Power Puzhou Thermal Power Shanxi Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [65.0%]; Shaanxi Coal and Chemical Industry Co Ltd [35.0%]
New unit 3 Jinkong Electric Power Puzhou Thermal Power Shanxi Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [65.0%]; Shaanxi Coal and Chemical Industry Co Ltd [35.0%]
New unit 4 Jinkong Electric Power Puzhou Thermal Power Shanxi Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [65.0%]; Shaanxi Coal and Chemical Industry Co Ltd [35.0%]
Unit 2 Datong Coal Mine Group Yongji Thermal Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; unknown [4.7%]
Unit 3 Datong Coal Mine Group Yongji Thermal Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; unknown [4.7%]
Unit 4 Datong Coal Mine Group Yongji Thermal Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; unknown [4.7%]
Unit 5 Datong Coal Mine Group Yongji Thermal Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; unknown [4.7%]
Unit 6 Datong Coal Mine Group Yongji Thermal Power Co Ltd [100%] Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; unknown [4.7%]

Project-level coal details

  • Coal source(s): domestic

Background

The first seven units of Yongji power station, totaling 380 MW, were commissioned from 1973 to 2000. Units 1-2 were retired in 1990, and units 3-7 retired in 2013. Units 8-9, totaling 600 MW, known as 晋能控股漳泽电力蒲州发电厂 were brought online between 2006 to 2007[2]. The plant is owned by Datong Coal Mining Group.[3]

Description of Expansion

Datong Coal planned two additional coal-fired units at this plant, units 10-11, with a total capacity of 700 MW. Construction began in 2013 and operation is planned for 2015-2016.[4][5]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ "华圣铝业、新时速等50个永济企业2012年最新简介", 永济人民政府网, 2012-10-19
  3. ↑ "同煤集团将大力推进三大煤电基地建设", 新华网山西频道, 2013-01-31
  4. ↑ "山西永济2×30万千瓦热电联产项目稳步推进", 北极星电力网新闻, 2014-06-06
  5. ↑ "山西永济热电工程4号机组空冷钢平台安装圆满完成," 2015-08-20

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.