Yudean Huadu Gas Thermal power station (粤电花都天然气热电厂) is an operating power station of at least 920-megawatts (MW) in Guangzhou, Huadu District, Guangdong, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Yudean Huadu Gas Thermal power station | Guangzhou, Huadu District, Guangdong, China | 23.36292, 113.093 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 23.36292, 113.093
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | operating[2] | gas[2] | 460[2] | combined cycle[2] | yes[2] | 2022[2] | – |
Unit 2 | operating[2] | gas[2] | 460[2] | combined cycle[2] | yes[2] | 2022[2] | – |
Unit 3 | announced[3] | gas[3] | 400[3] | not found | not found | – | – |
Unit 4 | announced[3] | gas[3] | 400[3] | not found | not found | – | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Guangdong Yudean Huadu Gas Thermal Power Co., Ltd.[4][1] | Guangdong Electric Power Development Co., Ltd. [65.0%]; Shenzhen Qianhai Dadi Capital Management Limited [20.0%]; Guangdong Guokun New Energy Co., Ltd. [10.0%]; Shenzhen Huayu Restaurant Co., Ltd. [5.0%] |
Unit 2 | Guangdong Yudean Huadu Gas Thermal Power Co., Ltd.[4][5] | Guangdong Electric Power Development Co., Ltd. [65.0%]; Shenzhen Qianhai Dadi Capital Management Limited [20.0%]; Guangdong Guokun New Energy Co., Ltd. [10.0%]; Shenzhen Huayu Restaurant Co., Ltd. [5.0%] |
Unit 3 | Guangdong Yudean Huadu Gas Thermal Power Co., Ltd.[4][6] | Guangdong Electric Power Development Co., Ltd. [65.0%]; Shenzhen Qianhai Dadi Capital Management Limited [20.0%]; Guangdong Guokun New Energy Co., Ltd. [10.0%]; Shenzhen Huayu Restaurant Co., Ltd. [5.0%] |
Unit 4 | Guangdong Yudean Huadu Gas Thermal Power Co., Ltd.[4][7] | Guangdong Electric Power Development Co., Ltd. [65.0%]; Shenzhen Qianhai Dadi Capital Management Limited [20.0%]; Guangdong Guokun New Energy Co., Ltd. [10.0%]; Shenzhen Huayu Restaurant Co., Ltd. [5.0%] |
Background
Unit 1 and Unit 2 obtained approval from the Guangdong Provincial Development and Reform Commission on August 15, 2016.[8] Construction officially started on September 19, 2020. [9]They were put into operation on July 25, 2022.[10]
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20211117065209/http://www.ncepucloud.com/yun/vip/vip_zs.html?e3156f59c3564a58a694866d2c4b6b71. Archived from the original on 17 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://m.bjx.com.cn/mnews/20220727/1244133.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20210604210958/http://campus.51job.com/gdyd/position.html. Archived from the original on 04 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://www.qcc.com/firm/80dac0fe5607b6f6e0a5e33ad33b810c.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211119005028/http://www.ncepucloud.com/yun/vip/vip_zs.html?e3156f59c3564a58a694866d2c4b6b72. Archived from the original on 19 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211119000646/http://www.ncepucloud.com/yun/vip/vip_zs.html?e3156f59c3564a58a694866d2c4b6b73. Archived from the original on 19 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211119011211/http://www.ncepucloud.com/yun/vip/vip_zs.html?e3156f59c3564a58a694866d2c4b6b74. Archived from the original on 19 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "广东粤电花都天然气热电有限公司2×400MW级燃气-蒸汽热电联". 2016-08-15. Retrieved 2023-11-03.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "中国能建设计承建广州花都2台400兆瓦级燃气-蒸汽热电联产项目开工". 2020-09-22. Retrieved 2023-11-03.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "广东粤电花都天然气热电联产项目一期工程建成投产". 2022-07-27. Retrieved 2023-11-03.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.