Yuhuan power station (华能玉环发电厂, 中煤玉环三期1×1000MW扩建项目, 中煤玉电1X1060MW大型清洁高效煤电项目) is an operating power station of at least 4200-megawatts (MW) in Yuhuan, Taizhou, Zhejiang, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yuhuan power station Yuhuan, Taizhou, Zhejiang, China 28.1151529, 121.1391369 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase IV Unit 6: 28.1151529, 121.1391369

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Operating coal: bituminous 1050 ultra-supercritical 2006
Phase I Unit 2 Operating coal: bituminous 1050 ultra-supercritical 2006
Phase II Unit 3 Operating coal: bituminous 1050 ultra-supercritical 2007
Phase II Unit 4 Operating coal: bituminous 1050 ultra-supercritical 2007
Phase III Unit 5 Construction[1] coal: bituminous 1060 ultra-supercritical 2025 (planned)
Phase IV Unit 6 Permitted[2] coal: bituminous 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Huaneng International Power Co Ltd Yuhuan Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase I Unit 2 Huaneng International Power Co Ltd Yuhuan Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase II Unit 3 Huaneng International Power Co Ltd Yuhuan Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase II Unit 4 Huaneng International Power Co Ltd Yuhuan Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase III Unit 5 Huaneng International Power Co Ltd Yuhuan Power Plant [100%] Huaneng Power International Inc [100.0%]
Phase IV Unit 6 Huaneng International Power Co Ltd Yuhuan Power Plant [100%] Huaneng Power International Inc [100.0%]

Background

The power station consists of four 1,050 MW units that were built from 2006-2007. Unit 1 was the first 1,000 MW unit commissioned in China. The plant is owned by China Huaneng.[3][4]

In 2021, the province listed a power station expansion as an "energy security" project in the 14th Five-Year Plan period.[5][6]

A January 2022 document described the power station layout.[7]

In April 2023, the expansion project was described as 1 x 1,000 MW.[8] The second expansion unit, Phase III Unit 6, was therefore presumed to be shelved.

In May 2023, Phase III was included on a Zhejiang key projects list.[9]

Articles and Resources

References

  1. https://news.bjx.com.cn/html/20241008/1403507.shtml. {{cite web}}: Missing or empty |title= (help)
  2. "华能玉环四期1×1000MW级燃煤发电技术工程可研报告编制和勘察设计-北极星火力发电网". news.bjx.com.cn. 2024-05-20. Archived from the original on 2024-05-31. Retrieved 2024-05-31.
  3. "Coal-Fired Plants in Zhejiang," industcards, accessed July 2015
  4. 玉环电厂 Baidu Baike
  5. "关于火电前期项目优选公示," Zhejiang Provincial Energy, December 30, 2021
  6. "华能玉环三期扩建项目完成浙江省能源局赋码," 北极星电力网新闻中心, 2021/8/19
  7. https://zjjcmspublic.oss-cn-hangzhou-zwynet-d01-a.internet.cloud.zj.gov.cn/jcms_files/jcms1/web3171/site/attach/0/c51718657b1d4dacb137f2fbda8b02dc.pdf," January 2022
  8. "煤电联营!华能玉环三期扩建项目,三方签约," BHI, 2023-04-27
  9. "90个电力能源项目!2023年浙江省重点建设和预安排项目计划发布," news.bjx.com, 2023-05-16