Yulin Bobai Chengnan Industrial Park cogen power station (玉林市博白县工业集中区城南产业园热电联产项目) is a power station in Yashan Town, Bobai, Yulin, Guangxi, China with multiple units of varying statuses none of which are currently operating. It is also known as Yulin Bobai cogen power station (Unit 1, Unit 2, Unit 3), 玉林市博白节能环保产业区热电联产项目 (Unit 1, Unit 2, Unit 3).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yulin Bobai Chengnan Industrial Park cogen power station Yashan Town, Bobai, Yulin, Guangxi, China 22.17978, 109.87923 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
South Unit 1 construction coal - unknown 30 circulating fluidized bed 2023
South Unit 2 permitted coal - unknown 30 circulating fluidized bed 2024
Unit 1 cancelled coal - unknown 30 circulating fluidized bed 2020
Unit 2 cancelled coal - unknown 30 circulating fluidized bed
Unit 3 cancelled coal - unknown 30 circulating fluidized bed

Table 3: Unit-level ownership and operator details

Unit name Owner
South Unit 1 Yulin Zhongyuan Environmental Protection Technology Co Ltd [100.0%]
South Unit 2 Yulin Zhongyuan Environmental Protection Technology Co Ltd [100.0%]
Unit 1 Guangxi Bobai Yantao Environmental Protection Technology Co Ltd [100.0%]
Unit 2 Guangxi Bobai Yantao Environmental Protection Technology Co Ltd [100.0%]
Unit 3 Guangxi Bobai Yantao Environmental Protection Technology Co Ltd [100.0%]

Project-level coal details

  • Permit(s): June 29, 2019, October 22, 2021

Background

玉林市中源环保科技有限公司

On 22 October 2021, Yulin Zhongyuan Environmental Protection Technology Co., Ltd. gained permission (桂发改电力〔2021〕947号) to build 2 X 30 MW units with 2×110t/h +1×220t/h high temperature and pressure CFB boilers and back-pressure steam turbines at the Chengnan Industrial Park, Yashan Town, Bobai County, Yulin City.[1]

The energy saving assessment of the project was passed in January 2022.[2]

The project was on the 2023 Guangxi Energy Infrastructure Construction Work Plan. Construction started in October 2021 and the power station is expected to enter operation before the end of 2024.[3] Taishan Group Co., Ltd. supplied the boilers.[4]

广西博白县研滔环保科技有限公司

Also in the Chengnan Industrial Park, on 29 June 2019, the Development and Reform Commission of Guangxi Zhuang Autonomous Region granted permission (桂发改能源〔2019〕666号) to Guangxi Bobai Yantao Environmental Protection Technology Co., Ltd. to build 3 x 30 MW units.[5] The project was name as Yulin Bobai cogen power station (玉林市博白节能环保产业区热电联产项目) and would be developed in three phases. The first phase would build a 1 x 220 t/h high temperature and pressure CFB boiler + 1 x 30 MW back-pressure steam turbine with a plan to enter operation in 2020. Once built, the power plant would provide heat to the industrial park and electricity to Guangxi grid.[6] However, no further development information can be found. The project might be replaced by the above 2 x 30 MW project, and it was presumed to be cancelled in 2023.

Articles and Resources

References

  1. "广西壮族自治区发展和改革委员会关于玉林市博白县工业集中区城南产业园热电联产项目核准的批复". 广西壮族自治区发展和改革委员会. 2021-10-25. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "广西壮族自治区发展和改革委员会关于玉林市博白县工业集中区城南产业园热电联产项目节能报告的批复". 广西壮族自治区发展和改革委员会. 2022-01-18. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. 广西发改委 (2023-03-30). "广西能源基础设施建设2023年工作推进方案". 北极星火电网. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "广西博白新生态纺织产业园举行热电联产锅炉二期110吨一台、220吨一台签约仪式". 中源环保网站. 2022-04-23. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. 能源局 (2019-07-05). "广西壮族自治区发展和改革委员会关于玉林市博白节能环保产业区3×220t/h热电联产项目核准的批复". 广西壮族自治区发展和改革委员会. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  6. "玉林市博白节能环保产业区3×220t/h热电联产项目获核准". 北极星电力网. 2019-07-08. Retrieved 2023-7-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)