Yulin Southwest New District Cogen power station (榆神榆横2×350MW热电联产工程项目) is an operating power station of at least 700-megawatts (MW) in New District, Yulin, Shaanxi, China with multiple units, some of which are not currently operating. It is also known as 榆林能源榆林西南新区热电项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Yulin Southwest New District Cogen power station New District, Yulin, Shaanxi, China 38.283333, 109.733333 (approximate)[1]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Phase II Unit 3 Permitted[1] coal: unknown[1] 660[1] ultra-supercritical[1] – 2026 (planned) False
Phase II Unit 4 Permitted[1] coal: unknown[1] 660[1] ultra-supercritical[1] – 2026 (planned) False
Unit 1 Operating[2] coal: unknown[3] 350[3] supercritical[4] yes[3] 2025[2] False
Unit 2 Operating[5] coal: unknown[3] 350[4] supercritical[4] yes[3] 2025[5] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase II Unit 3 Shaanxi Yuneng Yushen Southwest Thermal Power Co Ltd [100%][3] Shaanxi Yulin Energy Group Co Ltd [50.0%]; Yulin Yuyang District State Owned Assets Operation Co Ltd [20.0%]; Shenmu County State-owned Assets Operation Co [17.1%]; Yulin Hengshan Xingheng Project Management Co Ltd [10.0%]; China Development Bank Corp [2.9%]
Phase II Unit 4 Shaanxi Yuneng Yushen Southwest Thermal Power Co Ltd [100%][3] Shaanxi Yulin Energy Group Co Ltd [50.0%]; Yulin Yuyang District State Owned Assets Operation Co Ltd [20.0%]; Shenmu County State-owned Assets Operation Co [17.1%]; Yulin Hengshan Xingheng Project Management Co Ltd [10.0%]; China Development Bank Corp [2.9%]
Unit 1 Shaanxi Yuneng Yushen Southwest Thermal Power Co Ltd [100%][3] Shaanxi Yulin Energy Group Co Ltd [50.0%]; Yulin Yuyang District State Owned Assets Operation Co Ltd [20.0%]; Shenmu County State-owned Assets Operation Co [17.1%]; Yulin Hengshan Xingheng Project Management Co Ltd [10.0%]; China Development Bank Corp [2.9%]
Unit 2 Shaanxi Yuneng Yushen Southwest Thermal Power Co Ltd [100%][3] Shaanxi Yulin Energy Group Co Ltd [50.0%]; Yulin Yuyang District State Owned Assets Operation Co Ltd [20.0%]; Shenmu County State-owned Assets Operation Co [17.1%]; Yulin Hengshan Xingheng Project Management Co Ltd [10.0%]; China Development Bank Corp [2.9%]

Project-level coal details

  • Permit(s): 陕发改能电力【2025】342号[1]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

Shaanxi Yulin Energy Group has proposed to build a 2 x 350 MW coal plant in New District, Yulin.[6]

The project was permitted October 15, 2021.[7]

Construction began in October 2022.[8]

Unit 1 saw construction continue in 2023[9], with the boiler heating surface hoisted in September[10], the cooling tower hoisted in November[11], the generator stator hoisted in November[12], and the turbine high-pressure module hoisted in December[13]. In 2024, the turbine cover was completed in June[14], a molten salt energy storage project review was held in August[15], the cooling tower was capped in August[16], and the DCS system power was received in December[17]. In March 2025, the boiler acid wash and ignition were completed[18], the unit was connected to the grid on May 9[19], and passed the 168-hour trial, entering commercial operation on May 30[20].

Phase II Unit 3 had EIA report preparation services tendered in July 2024[21]. In March 2025, the project was approved by the provincial DRC[22]. In February 2026, preliminary survey and design were tendered[23].

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 https://news.bjx.com.cn/html/20250313/1431770.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250603/1444363.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 https://www.sohu.com/a/495829023_121123757. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 https://news.bjx.com.cn/html/20230418/1301593.shtml. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://news.bjx.com.cn/html/20250616/1446329.shtml. {{cite web}}: Missing or empty |title= (help)
  6. ↑ "热电板块," Shaanxi Yulin Energy Group, accessed Jan 2017
  7. ↑ "重大喜讯—榆神榆横2×350MW热电联产项目正式核准," Sohu, 2021-10-18
  8. ↑ "榆神榆横2×350MW热电联产工程完成主厂房浇筑第一罐混凝土节点," BJX, 2022-11-01
  9. ↑ "榆神榆横热电联产工程开工". 北极星电力网. 2023-04-18. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "榆神榆横项目1号机组锅炉受热面开始吊装". 微信公众平台. 2023-11-17. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "榆神榆横项目间冷塔首吊完成". 微信公众平台. 2023-11-17. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "榆神榆横1号机组发电机定子吊装就位". 微信公众平台. 2023-11-22. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "榆神榆横1号机组汽轮机高压模块吊装就位". 微信公众平台. 2024-01-19. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "榆神榆横1、2号机组汽轮机扣缸完成". 微信公众平台. 2024-07-10. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "榆神榆横基于熔盐的煤电抽汽蓄能项目初步设计审查". 北极星电力网. 2024-08-14. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "榆神榆横间冷塔顺利封顶". 微信公众平台. 2024-11-07. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "榆神榆横项目DCS受电一次成功". 微信公众平台. 2024-12-17. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "榆神榆横项目1号锅炉酸洗、点火完成". 微信公众平台. 2025-03-18. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "榆神榆横1号机组首次并网成功". 北极星电力网. 2025-05-12. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "榆神榆横1号机组通过168小时试运行". 微信公众平台. 2025-06-02. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "榆能榆横热电二期EIA编制服务招标". 陕西榆林能源集团. 2024-07-30. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "榆能榆横热电二期2×660MW项目核准批复". 北极星电力网. 2025-03-13. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "榆能榆横热电二期项目工程初步勘察设计招标". 北极星电力网. 2026-02-06. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.