Yunusabad power station (электростанция 4-го теплоцентра в Юнусабадском районе) is an operating power station of at least 100-megawatts (MW) in Tashkent, Yunusabad, Toshkent City, Uzbekistan. It is also known as 4th thermal power plant in Tashkent.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Yunusabad power station | Tashkent, Yunusabad, Toshkent City, Uzbekistan | 41.368528, 69.259064 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1: 41.368528, 69.259064
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Operating[2][3][4][5][6][7][1] | fossil gas: natural gas[1] | 100.1[3][5][1] | ICCC[3][1] | yes[6] | 2025[7][6][5] | Rolls-Royce[5] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Thermal Power Stations JSC [100%][1] | Thermal Power Stations JSC [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
In June 2023, Thermal Power Stations JSC and Italian credit agency "SACE” signed an agreement for the construction of 24 gas piston units on the territory of the 4th heating center in the Yunusabad district of Tashkent with a capacity of 4.3 MW each and 4 hot water boilers with a capacity of 130 MW each. The project is aimed at implementing the Resolution of the Cabinet of Ministers No. 13 “On improving the activities of district heating enterprises in the city of Tashkent” released in January 2023.[8]
The construction began in 2024.[9] In December 2024, during a briefing the press secretary of the Uzbekistan's Ministry of Energy mentioned that the 100-MW unit at the 4th thermal power plant in Tashkent would be commissioned in 2027.[10]
The construction of the plant is being carried out by Thermal Power Stations JSC and the Chinese companies CNTIC (China National Technical Import and Export Corporation), Vpower Holdings Singapore Pte. Limited, and Cntic Vpower Thermal Energy LLC. In May 2025, it was reported that the power station would be commissioned in 2025.[11] The project was completed in December 2025. The new power plant uses 70 gas piston units manufactured by British Rolls-Royce.[12]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "АО «Тепловые электрические станции» и кредитное агентство «SACE» совместно реализуют новый перспективный проект". minenergy.uz. Archived from the original on 2023-06-10. Retrieved 2024-04-03.
- ↑ https://www.tashkenttimes.uz/national/14204-5-thermal-power-plants-to-be-commissioned-before-2028.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://tpp.uz/ru/news/itogi-deyatelnosti-ao-teplovye-elektriceskie-stancii-za-2024-god-obsuzdeny-s-ucastiem-obshhestvennogo-soveta-i-predstavitelei-smi.
{{cite web}}: Missing or empty|title=(help) - ↑ https://tpp.uz/ru/news/budut-osushhestvleny-raboty-po-poetapnomu-vyvedeniyu-iz-ekspluatacii-staryx-i-nizkoenergoeffektivnyx-ustanovok-teplovyx-elektriceskix-stancii.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 https://www.spot.uz/ru/2025/12/16/yunusobod-cogenerate/.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 https://tkg-ies.uz/ru/news/na-territorii-4-i-teplocentra-v-yunusabadskom-raione-stroitsya-gazoporsnevaya-elektrostanciya-moshhnostyu-100-mvt.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://gov.uz/uz/minenergy/news/view/29602.
{{cite web}}: Missing or empty|title=(help) - ↑ ""Thermal Power Plants" JSC and the credit agency "SACE" jointly implement a new promising project". Invest in Uzbrkistan. June 9, 2023. Retrieved November 19, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Итоги деятельности АО «Тепловые электрические станции» за 2024 год обсуждены с участием Общественного совета и представителей СМИ". IES. March 27, 2025. Retrieved April 8, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Information about major projects being implemented in our country to introduce solar, wind and thermal power plants". Government Portal of the Republic of Uzbekistan. December 6, 2024. Retrieved April 8, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "A 100 MW gas piston power plant is being built on the territory of the 4th heating center in the Yunusabad district". tkg-ies.uz. May 16, 2025. Retrieved September 19, 2025.
{{cite web}}: CS1 maint: url-status (link) - ↑ "На Юнусабаде заработала новая отопительная электростанция на 100 МВт – Spot". www.spot.uz. 2025-12-16. Retrieved 2026-01-20.
{{cite web}}: no-break space character in|title=at position 3 (help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.