Zhaogu power station (焦煤集团赵固2×35万千瓦低热值煤发电厂项目, 焦煤赵固电厂) is a power station in the pre-permit stage in Jitun Town, Hui County, Xinxiang, Henan, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhaogu power station Jitun Town, Hui County, Xinxiang, Henan, China 35.405281, 113.627835 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 35.405281, 113.627835

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Emergency/Backup
Unit 1 Pre-permit[1] coal: waste coal[1][2] 350[1] supercritical[1] False
Unit 2 Pre-permit[1] coal: waste coal[1][2] 350[1] supercritical[1] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Jiaozuo Coal Industry (Group) Xinxiang Zhaogu Electric Power Co Ltd [100%] Henan Province Energy Chemical Group Co Ltd [100.0%]
Unit 2 Jiaozuo Coal Industry (Group) Xinxiang Zhaogu Electric Power Co Ltd [100%] Henan Province Energy Chemical Group Co Ltd [100.0%]

Project-level captive use details

  • Captive industry: Aluminum[1]


Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

Jiaozuo Mining Group is seeking permitting for a 2 x 350 MW coal plant in Zhaogu Village, Jitun Town, Hui County.[3]

The project was permitted in March 2016.[4]

Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects, including Zhaogu. It is unclear when or if the projects will be revived.[5]

For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

Unit 1 had a feasibility study review meeting held in July 2024[6], a social stability risk assessment tender issued in August[7], and a land acquisition pre-announcement made in September[8]. In January 2025, the preliminary design was nearly completed[9]. In June 2025, another land acquisition pre-announcement was made[10]. In 2026, no significant progress was reported, though the project appeared on a list of Henan's top ten power projects[11].

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://mp.weixin.qq.com/s/9ik-mxvPesQv5zehSpOoHg. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ "焦作煤业集团赵固电厂2×35万千瓦低热值煤发电厂项目环境影响报告书," 中国电力化工网, 2016-04-05
  4. ↑ "焦作煤业集团赵固电厂2×35万千瓦低热值煤发电厂项目环境影响报告书," April 5, 2016
  5. ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
  6. ↑ "焦煤集团赵固2×35万千瓦低热值煤发电厂项目可行性研究报告评审会". 微信公众平台. 2024-07-05. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "焦作煤业集团赵固项目社会稳定风险评估服务采购". 微信公众平台. 2024-08-12. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "焦作煤业集团赵固低热值煤发电厂项目征地预公告". 辉县市人民政府. 2024-09-19. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "焦煤公司持续推进赵固电厂项目落地". 河南能源集团. 2025-01-01. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "焦作煤业集团赵固2×35万千瓦低热值煤发电厂项目征地预公告" (PDF). 辉县市人民政府. 2025-06-18. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "2025河南十大火电项目". 微信公众平台. 2026-06-02. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)