Zhongtian Hechuang Ordos power station
From Global Energy Monitor
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Zhongtian Hechuang Ordos power station (中天合创鄂尔多斯煤炭深加工示范项目热电联产) is an operating power station of at least 300-megawatts (MW) in Tuke Industrial Park, Uxin Banner, Ordos, Inner Mongolia, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Zhongtian Hechuang Ordos power station | Tuke Industrial Park, Uxin Banner, Ordos, Inner Mongolia, China | 39.085839, 109.473878 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3: 39.085839, 109.473878
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | Operating | coal: unknown | 135 | subcritical | 2016 |
Unit 2 | Operating | coal: unknown | 135 | subcritical | 2016 |
Unit 3 | Operating | coal: unknown | 30 | subcritical | 2016 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Zhongtian Hechuang Energy Co Ltd [100%] | China Coal Energy Co Ltd [38.8%]; China Petrochemical Corp [38.8%]; Shenergy Co Ltd [12.5%]; Manshi Investment Group Co Ltd [9.9%]; unknown [0.1%] |
Unit 2 | Zhongtian Hechuang Energy Co Ltd [100%] | China Coal Energy Co Ltd [38.8%]; China Petrochemical Corp [38.8%]; Shenergy Co Ltd [12.5%]; Manshi Investment Group Co Ltd [9.9%]; unknown [0.1%] |
Unit 3 | Zhongtian Hechuang Energy Co Ltd [100%] | China Coal Energy Co Ltd [38.8%]; China Petrochemical Corp [38.8%]; Shenergy Co Ltd [12.5%]; Manshi Investment Group Co Ltd [9.9%]; unknown [0.1%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Background on Project
Sinopec is currently planning to build a three-unit coal-fired power plant with a total planned capacity of 300 MW in Inner Mongolia Autonomous Region. The project was permitted in 2013,[1] and is under construction.[2]
The plant was commissioned in 2016.[3]
Articles and Resources
References
- ↑ "鄂尔多斯煤炭深加工示范项目一期获准," 北极星电力网新闻中心, 2013/8/23
- ↑ "公司积极筹备中天合创项目对口支援工作," 2014-1-22
- ↑ "Zhongtianhe Ordos coal deep processing demonstration project thermal power plant general contracting project in the overall ceremony," Sinopec, 2017-01-06
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.