Zhundong South Surface Mine(Phase 1)

From Global Energy Monitor

Zhundong South Surface Mine(Phase 1) (新疆天池能源有限责任公司准东大井矿区南露天煤矿(一期)) is located in Jimsar County, Changji Prefecture, Xinjiang Uygur Autonomous Region, China.

Location

The undated satellite photo below shows the coal mine located in Jimsar County, Changji Prefecture, Xinjiang Uygur Autonomous Region, China.

Loading map...

Coal Mine Background

The Zhundong South Surface Mine is operated by Xinjiang Tianchi Energy Co., Ltd. It is located in the west of Dajing Mining Area, Zhundong Coalfield, Xinjiang. The planned scale is 30 million tons/year, the first phase is 10 million tons/year, and the second phase is 20 million tons/year. The first phase of the project started in April 2009,[1] completed in December 2013 and passed environmental protection acceptance in August 2016.[2]

  • Sponsor: Xinjiang Tianchi Energy Co., Ltd.
  • Parent Company: Tebian Electric Apparatus(TBEA)(85.78%), Xinjiang Joinworld Co.(14.22%)
  • Location: Jimsar County, Changji Prefecture, Xinjiang Uygur Autonomous Region, China.
  • GPS Coordinates: 44.818916,89.233076(exact)
  • Status: Operating
  • Production Capacity: 10Mt/a[2]
  • Total Resource: 493.88Mt[3]
  • Minable Reserves: 329.11Mt[3]
  • Coal Type: bit(non-caking coal)[4]
  • Mine Size: 87.2331k㎡[4]
  • Mine Type: Surface
  • Start Year: 2017
  • Total Investment: RMB 2823.35 billion [3]

Articles and resources