Zohr–Al Gamil Pipelines

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Zohr–Al Gamil Pipelines خطوط غاز ظهر-الجميل , are operating gas pipelines running from Shorouk concession in the Mediterranean Sea offshore to Port Said Province, Egypt. [1]

Location

The pipelines run from Shorouk concession in the Mediterranean Sea offshore to Port Said Province, Egypt. [1]

Loading map...

Project details

Zohr–Al Gamil Pipeline "1"

  • Operator:
  • Owner: General Petroleum Company (GPC)[2][3]
  • Parent company: General Petroleum Company (GPC), Eni, Rosneft, BP, Mubadala Petroleum[2][3][1]
  • Length: 216 km[1]
  • Diameter: 30 in[1]
  • Status: Operating[1]
  • Start year: 2019[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Zohr–Al Gamil Pipeline "2"

  • Operator:
  • Owner: General Petroleum Company (GPC)[2][3]
  • Parent company: General Petroleum Company (GPC), Eni, Rosneft, BP, Mubadala Petroleum[2][3][1]
  • Capacity: 1350 bcm/y[2]
  • Length: 216 km[1]
  • Diameter: 30 in[1]
  • Status: Operating[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Zohr Gas Field, Mediterranean Sea". NS Energy. Retrieved 2024-07-31.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 "إيني تستكمل خط أنابيب يربط حقل ظهر بمصنع دمياط في أبريل". انتربرايز. Retrieved 2024-07-31.
  3. 3.0 3.1 3.2 3.3 "Zohr Gas Field, Mediterranean Sea". NS Energy. Retrieved 2024-07-31.
  4. 4.0 4.1 "إيني تستكمل خط أنابيب يربط حقل ظهر بمصنع دمياط في أبريل". انتربرايز. Retrieved 2024-07-31.