İÇDAŞ Bekirli power station (Bekirli Termik Santrali) is an operating power station of at least 1200-megawatts (MW) in Değirmencik, Biga, Çanakkale, Türkiye.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| İÇDAŞ Bekirli power station | Değirmencik, Biga, Çanakkale, Türkiye | 40.39953, 27.04973 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 40.39953, 27.04973
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: lignite[1] | 600 | supercritical | 2011 | False |
| Unit 2 | Operating | coal: lignite[1] | 600 | supercritical | 2015 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | İÇDAŞ Elektrik Enerjisi Üretim ve Yatırım AŞ [100%] | Içdaş Çelik Enerji Tersane Ve Ulaşim Sanayi AŞ [95.0%]; unknown [5.0%] |
| Unit 2 | İÇDAŞ Elektrik Enerjisi Üretim ve Yatırım AŞ [100%] | Içdaş Çelik Enerji Tersane Ve Ulaşim Sanayi AŞ [95.0%]; unknown [5.0%] |
Project-level captive use details
- Captive industry use (heat or power): power
- Captive industry: Iron & Steel
Project-level coal details
- Coal source(s): imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Financing
- Source of financing: İş Bankası
Background
The original İÇDAŞ Biga power station consists of a 3 x 135 MW subcritical coal plant, built in 2005-2009.[2] It is also known as İÇDAŞ Değirmencik power station.[3] In December 2007, industrial conglomerate İÇDAŞ received permits to build a three-unit, 405-MW coal-fired power plant as part of the larger İÇDAŞ Değirmencik Integrated Plant that it was planning to build in Çanakkale province — along with a shipyard, port facilities, and a steel mill. Although the plant was licensed at 405 MW, it was built at 389 MW.[4]
In April 2007, industrial conglomerate İÇDAŞ received permits to build the two-unit, 1,200-MW, US$1 billion İÇDAŞ Bekirli power station. The first 600-MW unit went online in December 2011; the second unit was originally scheduled to go online in the last quarter of 2013, but was in fact brought online in May 2015.[5][6][7] Attempts by environmental groups in 2007-10 to stop the plant's permitting process were unsuccessful.[8]
Funding for the project was provided by İş Bankası.[9]
Articles and Resources
References
- ↑ 1.0 1.1 (PDF) https://www.komurder.org/uploads/Haber-Galerisi/2024/euas-ve-komurder-isbirligi/euas_ve_komurder_isbirligi.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "Icdas Bekirli Thermal Power Plant," Icdas website, accessed June 2016
- ↑ Toolkit: Coal Power Generation and Health in Three Regions of Turkey; Çanakkale, İzmİr and Tekİrdağ, Health and environment alliance - Heal, January 2018.
- ↑ İÇDAŞ Sustainability Report 2011-2012, p. 9 & others, accessed Mar. 2014.
- ↑ İÇDAŞ Süperkritik Bekirli Termik Santrali'nin İkinci Ünitesi'ni açtı, Deniz Haber, 22 May 2015.
- ↑ Bekirli Thermal Power Station 1. Unit, İÇDAŞ website, accessed Mar. 2014.
- ↑ İÇDAŞ Sustainability Report 2011-2012, accessed Mar. 2014.
- ↑ Çanakkale Çevre Platformu website, accessed Mar. 2014.
- ↑ "Coal & Climate Change - 2017" (PDF). August 2017.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.