AMC Coal Mines

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

AMC Coal Mines is an operating coal mine in Lampunut, Murung Raya, Central Kalimantan, Indonesia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
AMC Coal Mines Lampunut, Murung Raya, Central Kalimantan, Indonesia 0.224239, 113.550687 (approximate)

The map below shows the approximate location of the coal mine:


Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[1] – 2017[1] 2047 (planned)[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
– 4.83[2] 2023[2] Surface Open Pit 249.9[2] 60* 756.3240683*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
92.2[2] 2023[2] 101.4[2] – Bituminous Met[3] –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
PT Maruwai Coal [100.0%][3] PT Adaro Minerals Indonesia

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023 2024 2025
ROM 0.9[4] 1.01[5] 1.09[6] 1.88[7] 2.3[8] 3.37[9] 5.11[10] – –

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

AMC Coal Mines are operated by Adaro Energy Indonesia's PT Adaro Minerals Indonesia Tbk, in Lampunut, Murung Raya Regency, Central Kalimantan Province, Indonesia.[11][12]

The company has long proposed to increase production through the IndoMet Coal Project. AMC Coal Mines include five coal concessions, including PT Lahai Coal (LC), PT Maruwai Coal (MC), PT Sumber Barito Coal (SBC), PT Kalteng Coal (KC) and PT Juloi Coal (JC).

The concession areas are located in the Central Kalimantan and East Kalimantan province with a total area of 146,579 hectares.

As of 31 December 2022, two out of five subsidiaries, i.e. PT Lahai Coal (LC) and PT Maruwai Coal (MC) have been operational, while PT Sumber Barito Coal (SBC), PT Kalteng Coal (KC) and PT Juloi Coal (JC) were still in Operation Production phase. [13] While the mine was previously owned and operated by Adaro Metcoal Companies (AMC), in 2022, Adaro moved its metallurgical coal assets under PT Adaro Minerals Indonesia Tbk.[12]

As of December 2023, AMC's total coal reserves is 173.0 million tonnes and total coal resources is 975.6 million tonnes.[14]

A 2025 study published in Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil examined haul road maintenance at PT Maruwai Coal's Lampunut site. The study found that in April 2023, dump truck cycle rates fell to 1.58 cycles per shift against a target of 2 cycles per shift, resulting in an estimated production loss of 26%, or 91,280 tons, attributed to declining haul road quality. Following the application of geocell and geopoll materials on a segment of haul road, researchers recorded an increase in the Coal Hauling Road Index from 83% to 91.23%, along with increases in average vehicle speed and monthly coal production.[15]

  • Operator: PT Adaro Minerals Indonesia Tbk[13]
  • Owner: PT Adaro Minerals Indonesia Tbk[13]
  • Location: Lampunut, Murung Raya Regency, Central Kalimantan Province, Indonesia
  • Coordinates:0.224239, 113.550687 (approximate)
  • Status: Operating
  • Mine Type: Surface
  • Production: 3.37 million tonnes(2022)[13]
  • Reserves: 165.4 million tonnes[13]
  • Resource: 975 million tonnes[13]
  • Source of financing:
  • Permits and applications:

Coal Mine Boundaries and Methane Sources

Global Energy Monitor researchers have identified coal mine boundary/boundaries and potential sources of coal mine methane (CMM) for this mine. These research results can be used to drive CMM attribution and mitigation efforts, particularly when combined with remotely sensed methane plume locations and mine ownership data. Explore the results with the embedded map at the top of this page by clicking on the mine boundary polygon or the CMM placemarkers to reveal more details. A detailed description of this research can be found in Coal Mine Boundaries and Methane Sources. This data is also available as a downloadable companion dataset to the Global Coal Mine Tracker and the Global Methane Emitters Tracker.

Table SMP1: Coal mine boundaries and methane sources data

ID Mine feature category Mine feature subcategory Description Coordinates precision Data source date
M1339.B1 mine boundary surface AMC Coal Mines - PT Lahai Coal (LC) boundary estimated 2024-09-01 00:00:00
M1339.B2 mine boundary surface AMC Coal Mines - PT Maruwai Coal (MC) boundary estimated 2024-09-01 00:00:00
M1339.B3 mine boundary surface AMC Coal Mines - PT Sumber Barito Coal (SBC) boundary part 1 estimated 2024-09-01 00:00:00
M1339.B4 mine boundary surface AMC Coal Mines - PT Sumber Barito Coal (SBC) boundary part 2 estimated 2024-09-01 00:00:00
M1339.B5 mine boundary surface AMC Coal Mines - PT Kalteng Coal (KC) boundary part 1 estimated 2024-09-01 00:00:00
M1339.B6 mine boundary surface AMC Coal Mines - PT Kalteng Coal (KC) boundary part 2 estimated 2024-09-01 00:00:00
M1339.B7 mine boundary surface AMC Coal Mines - PT Kalteng Coal (KC) boundary part 3 estimated 2024-09-01 00:00:00
M1339.B8 mine boundary surface AMC Coal Mines - PT Kalteng Coal (KC) boundary part 4 estimated 2024-09-01 00:00:00
M1339.B9 mine boundary surface AMC Coal Mines - PT Juloi Coal (JC) boundary part 1 estimated 2024-09-01 00:00:00
M1339.B10 mine boundary surface AMC Coal Mines - PT Juloi Coal (JC) boundary part 2 estimated 2024-09-01 00:00:00
M1339.B11 mine boundary surface AMC Coal Mines - PT Juloi Coal (JC) boundary part 3 estimated 2024-09-01 00:00:00

Table SMP2: Coal mine boundaries and methane sources data (continued)

Coal mine boundaries and methane sources were last researched for this mine on Sep 15, 2025
ID Notes
M1339.B1 The boundary was extracted from the concession area shown on page 309 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production, and the Concession Area as 46,620 hectares. The area of the extracted boundary is 45,360 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B2 The boundary was extracted from the concession area shown on page 330 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production, and the Concession Area as 24,990 hectares. The area of the extracted boundary is 22,679 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B3 The boundary was extracted from the concession area shown on page 404 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,993 hectares. The area of this extracted boundary part is 41,980 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B4 The boundary was extracted from the concession area shown on page 404 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,993 hectares. The area of this extracted boundary part is 2,978 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B5 The boundary was extracted from the concession area shown on page 286 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 12,913 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B6 The boundary was extracted from the concession area shown on page 286 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 3,310 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B7 The boundary was extracted from the concession area shown on page 286 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 10,499 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B8 The boundary was extracted from the concession area shown on page 286 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 991 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B9 The boundary was extracted from the concession area shown on page 281 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 13,687 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B10 The boundary was extracted from the concession area shown on page 281 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 8,138 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.
M1339.B11 The boundary was extracted from the concession area shown on page 281 of the INDONESIAN COAL BOOK 2024-2026, released September 2024 (no ISBN was found). The Status table lists the Tenement Status as Production Operation, and the Concession Area as 24,988 hectares. The area of this extracted boundary part is 2,352 hectares. Due to the complexities of boundary extraction, the precision is left as estimated.

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 Cite error: Invalid <ref> tag; no text was provided for refs named autoref_1
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.petromindo.com/products/detail?id=512. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://aei.or.id/halaman-anggota/pt-adaro-minerals-indonesia-tbk/about. {{cite web}}: Missing or empty |title= (help)
  4. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/1376/ADRO%2020180402%20-%20Laporan%20Tahunan%202017%20-%20Blurred.pdf. {{cite web}}: Missing or empty |title= (help)
  5. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/1648/ADRO%2020190408%20-%20Laporan%20Tahunan%202018%20-%20web.pdf. {{cite web}}: Missing or empty |title= (help)
  6. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/1915/ADRO%2020200428%20Laporan%20Tahunan%20ADRO%202019.pdf. {{cite web}}: Missing or empty |title= (help)
  7. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/2036/ADRO%2020210401%20Laporan%20Tahunan%202020.pdf. {{cite web}}: Missing or empty |title= (help)
  8. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/2107/AEI%2020220223%204Q21%20QAR%20Final%20English.pdf. {{cite web}}: Missing or empty |title= (help)
  9. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/2195/ADRO%204Q22%20QAR%20Final.pdf. {{cite web}}: Missing or empty |title= (help)
  10. ↑ (PDF) https://www.adaro.com/files/news/berkas_eng/2243/ADRO%20FY23%20FPR%20QAR%20Final.pdf. {{cite web}}: Missing or empty |title= (help)
  11. ↑ Indonesian Coal Book 2020/2021
  12. ↑ 12.0 12.1 2021 Annual Report, Adaro Energy Indonesia website, accessed June 2022
  13. ↑ 13.0 13.1 13.2 13.3 13.4 13.5 Adaro Minerals Annual Report 2022, accessed October 2023
  14. ↑ "PT Adaro Minerals Indonesia Tbk". Asosiasi Emiten Indonesia (AEI). Retrieved 2026-08-24.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ Raharjo, Oky Fauzi; Mudiyono, R.; Rochim, A. (2025). "Inovasi Material Geosintetik (Geocell) dan Kimia (Geopoll) untuk Optimalisasi Perbaikan Jalan Hauling di PT. Maruwai Coal". Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil. Retrieved 2026-08-24.{{cite web}}: CS1 maint: url-status (link)