Agha Steel Industries Karachi plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Agha Steel Industries Karachi plant (آغا اسٹیل انڈسٹریز لمیٹڈ (arabic)), also known as ASIL, is a 700 thousand tonnes per annum (TTPA) electric arc furnace (EAF) steel plant operating in Karachi, Sindh, Pakistan.
Location
The map below shows the location of the steel plant in Karachi, Sindh, Pakistan.
- Location: NW17/1/P -133, SP6, D -2, Port Qasim Authority, Karachi, Pakistan[1]
- Coordinates (WGS 84): 24.841851, 67.310159 (exact)
Plant Details
Table 1: General Plant Details
Plant status | Start date |
---|---|
operating[2] | 2012[3] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Owner | Owner company PermID |
---|---|---|---|
Agha Steel Industries Ltd [100%][4] | 5054560653 [100%] | Agha Steel Industries Ltd[4] | 5054560653 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | Main production equipment | Detailed production equipment |
---|---|---|---|---|
semi-finished; finished rolled[5] | billets; rebar; e-bar[5] | automotive; building and infrastructure; energy[6] | electric arc furnace (EAF)[3] | EAF (# unknown)[7] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum):
Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|
700 TTPA[2] | 700 TTPA |
Table 5: Actual Crude Steel Production by Year (thousand tonnes per annum):
Year | BOF Production | EAF Production | OHF Production | Total (all routes) |
---|---|---|---|---|
2020 | – | 331 TTPA[8] | – | 331 TTPA |
2021 | – | 314 TTPA[8] | – | 314 TTPA |
Articles and Resources
References
- ↑ https://web.archive.org/web/20220112203002/https://aghasteel.com/contact-us/. Archived from the original on 2022-01-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20220113190814/https://aghasteel.com/reports/yearly2021.pdf. Archived from the original (PDF) on 2022-01-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20210411014928/https://aghasteel.com/about-asil/the-company/. Archived from the original on 2021-04-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20220111154054/https://aghasteel.com/karachi-based-third-generation-steel-maker/. Archived from the original on 2022-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20210411012720/https://aghasteel.com/products-and-quality-controls/. Archived from the original on 2021-04-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220120123555/https://aghasteel.com/clientage-and-distribution/major-projects-and-clients/. Archived from the original on 2022-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210411013420/https://aghasteel.com/manufacturing-infrastructure/manufacturing-plant/. Archived from the original on 2021-04-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 (PDF) https://web.archive.org/web/20221130145614/https://aghasteel.com/reports/yearly2022.pdf. Archived from the original (PDF) on 2022-11-30.
{{cite web}}
: Missing or empty|title=
(help)
Other resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.