Amreli Steels Dhabeji plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Amreli Steels Dhabeji plant is a steel plant in Dhabeji, Sindh, Pakistan that operates steelmaking and induction furnace (IF) technology.
Location
The map below shows the exact location of the plant in Dhabeji, Sindh, Pakistan:
- Location: Dhabeji, Sindh, Pakistan
- Coordinates (WGS 84): 24.800326, 67.504851 (exact)
Background
Amreli Steels was founded in 1972 as a rebar manufacturing company. The billet plant was inaugurated in 2011 with an annual capacity of 200 ttpa.[1]
In November 2018, Amreli Steels announced its third phase of an expansion plan for establishing an additional state-of-the-art rolling mill using Pioneering Technology at Dhabeji special economic zone (SEZ) at a projected cost of Rs 6.5 billion, which would increase its rolling capacity from 605 thousand metric tons per annum (ttpa) to 1,105 ttpa. This would increase the melting capacity of the plant from 600 ttpa to 1,000 ttpa.[2]
Since 2024, Amreli Steels has experienced financial difficulties as a result of low demand for steel and limited material availability.[3] Capacity utilization fell by more than 60% in 2025, to a total production of just over 70,000 tons from the 600 ttpa plant.[4] In October 2025, the company announced a massive financial restructuring based on more than 27 billion rupees in loans.[5] As of 2025, there have been no further developments regarding the planned expansion announced in 2018.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source |
|---|---|---|
| 2011[6] | 757[7] | 7.1 MW Solar power plant[7] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Amreli Steels Ltd [100.0%] | 4296689730 [100.0%] | E100001012762 [100.0%] | Amreli Steels Ltd [100%][8] | 4296689730 | E100001012762 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|---|
| semi-finished, finished rolled[7] | billet, rebar[7] | building and infrastructure, energy[7] | yes[7][9] | unknown[7] | unknown | IF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Induction furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|
| cancelled | – | 400[10] | 400[10] |
| operating | 600[7][11] | – | 600[7][11] |
Table 5: Upstream Products Production Capacities (thousand tonnes per annum)
| Ferronickel | Sinter | Coke | Pellets |
|---|---|---|---|
| NF | NF | NF | NF |
Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | Other/unknown steel production | Total (all routes) |
|---|---|---|
| 2019 | 444[11] | 444[11] |
| 2020 | 294[11] | 294[11] |
| 2021 | 366[12] | 366[12] |
| 2022 | 381[13] | 380[13] |
| 2023 | 215[7] | 215[7] |
| 2024 | 167[14] | 167[14] |
| 2025 | 71[15] | 70[15] |
Unit Details
Table 7: Induction Furnace Details
| Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Current capacity (ttpa) |
|---|---|---|---|---|---|
| unknown IF (1) | operating[16][6][7] | – | 2011[6] | PLC[17] | 200[7] |
| unknown IF (2) | operating[16][6][7] | 2017[11] | 2018[18][19] | – | 200[11][7] |
| unknown IF (3) | operating[16][6][7] | 2017[11] | 2018[19] | – | 200[11][7] |
Table 8: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap |
|---|---|---|
| unknown IF (1) | yes[20] | 100.00[20] |
| unknown IF (2) | yes[20] | 100.00[20] |
| unknown IF (3) | yes[20] | 100.00[20] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "About Us – Amreli Steel". amreli.texter.pk. Retrieved 2025-01-10.
- ↑ Farooq, Mohammad (2018-11-09). "Amreli Steels to set up Rs 6.5 billion state-of-the-art rolling mill at Dhabeji". Profit by Pakistan Today. Retrieved 2025-01-14.
- ↑ "Amreli Steels : Corporate Briefing Session 2025 - Presentation | MarketScreener". www.marketscreener.com. Retrieved 2025-12-05.
- ↑ "2025 Annual Report" (PDF). Amreli Steels.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Dada Partners deliver landmark restructuring for Amreli Steels - Profit by Pakistan Today". profit.pakistantoday.com.pk. Retrieved 2025-12-05.
- ↑ 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20240912171707/https://weeklycorporateambassador.wordpress.com/2018/04/11/amreli-steel-_-pioneer-of-innovation-and-market-leader-in-pakistan/. Archived from the original on 2024-09-12.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 (PDF) https://web.archive.org/web/20240302093205/https://amrelisteels.com/wp-content/uploads/2023/10/Amreli-Annual-Report-2023-SP.pdf. Archived from the original (PDF) on 2024-03-02.
{{cite web}}: Missing or empty|title=(help) - ↑ https://amrelisteels.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20251212191551/https://www.pacra.com/rating-report/MTQ2NDI=. Archived from the original on 2025-12-12.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 https://profit.pakistantoday.com.pk/2018/11/09/amreli-steels-to-set-up-rs-6-5-billion-state-of-the-art-rolling-mill-at-dhabeji/.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.00 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 11.09 (PDF) https://amreli.texter.pk/wp-content/uploads/2021/07/Amreli-Steels-Annual-Report-2020.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 (PDF) https://amrelisteels.com/wp-content/uploads/2021/10/Amreli-Annual-Report-2021.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.0 13.1 "AMreli Steels Annual report 2022" (PDF). Amreli Steels. 2023. Archived from the original (PDF) on 2025-04-28. Retrieved 2025-01-14.
- ↑ 14.0 14.1 (PDF) https://web.archive.org/web/20251212191446/https://amrelisteels.com/wp-content/uploads/2024/11/Amreli-Annual-Report-2024-3.pdf. Archived from the original (PDF) on 2025-12-12.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 (PDF) https://web.archive.org/web/20251212191519/https://amrelisteels.com/wp-content/uploads/2025/10/Annual-Report-2025.pdf. Archived from the original (PDF) on 2025-12-12.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.0 16.1 16.2 "Amreli Steel Steel Manufacturing Process". Youtube. 2017-08-05. Archived from the original on 2025-04-28. Retrieved 2025-01-14.
- ↑ https://web.archive.org/web/20240304061740/https://www.youtube.com/watch?v=hZjWGwgidn0. Archived from the original on 2024-03-04.
{{cite web}}: Missing or empty|title=(help) - ↑ "Amreli Steels rolls out Dhabeji plant". www.thenews.com.pk. 2018-05-01. Archived from the original on 2025-04-28. Retrieved 2025-01-14.
- ↑ 19.0 19.1 "Amreli Steels reports 48% surge in profit for FY18". The Express Tribune. 2018-09-12. Archived from the original on 2025-04-28. Retrieved 2025-01-14.
- ↑ 20.0 20.1 20.2 20.3 20.4 20.5 "Steel Manufacturing Process". Youtube. 2018-04-24. Archived from the original on 2025-04-28. Retrieved 2025-01-14.
{{cite web}}: Text "Amreli Steels" ignored (help)
Resources
- [amrelisteels.com Company website]
- Wikipedia