Andrés LNG Terminal, also known as Terminal de GNL de Andrés, is an operating LNG import terminal in Dominican Republic.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Andrés LNG Terminal Andres, Boca Chica, Santo Domingo, Dominican Republic[1] 18.406993, -69.628234 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Andrés LNG Terminal import[2][3][4] operating[5][4] 1.9 mtpa[4] 1.9 mtpa False Andrés power station, Los Mina power station, Quisqueya 1 & 2 power stations, San Pedro de Macoris power station[6][7][8][9][10]

Table 3: Cost

Name Facility type Cost Total known terminal costs
Andrés LNG Terminal import[2][3][4] US$400,000,000[6] US$400,000,000

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Andrés LNG Terminal import[2][3][4] operating[5][4] 2003[5][4]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Andrés LNG Terminal import[2][3][4] operating[5][4] Grupo Linda [5%]; Administradora de Fondos de Inversión Popular SA [10%]; AES Corp [80%]; Grupo Estrella Holdings SA [5%][4][11][5][12][4][11][5][12][4][11][5][12][4][11][5][12] AES Corp [80.0%]; Grupo Popular SA [10.0%]; Grupo Estrella Holdings SA [5.0%]; Grupo Linda [5.0%] AES Andrés DR[6][3]

Background

Andrés LNG Terminal is an LNG terminal in Santo Domingo, Dominican Republic that was commissioned in February 2003[13] as part of a 400 million dollar project that also included the AES Andrés power station and a pipeline extension to an existing power plant.[14]

AES awarded a lump-sum turnkey engineering, procurement, and construction contract to CB&I for the LNG import terminal. It includes a 160,000 m3 LNG storage tank and three unloading arms capable of unloading LNG vessels at a rate of 10,000 m3 per hour. The terminal provides natural gas to customers in the industrial, transportation and power generation sectors, including the adjacent AES Andrés power station and the DPP Los Mina power station operated by Dominican Power Partners in Los Mina, 34 km to the west.[15][16]

In August 2015, AES Dominica announced that it would offer LNG bunkering at the Andres LNG Terminal, and that it had begun work to modify the terminal for LNG reloads onto vessels sized between 10,000 m3 and 60,000 m3.[17] The Andres LNG terminal completed its first LNG reload in February 2017, reloading between 60,000 and 70,000 m3 of LNG from the terminal onto the 138,826 m3 Cadiz Knutsen for delivery to the United Kingdom's Grain LNG Terminal.[18]

In 2018, AES Andres began building the Eastern Gas Pipeline, a project designed to bring natural gas from the Boca Chica terminal to several power plants in the San Pedro de Macorís region.[19][20] In 2020, the 50-kilometer pipeline began supplying the Quisqueya I, Quisqueya II, and San Pedro de Macoris power stations, starting in February, June and November, respectively.[21]

The Andrés terminal has increasingly sought to establish itself as a regional hub for LNG distribution.[22] In 2020 the terminal provided re-exports to Panama and Jamaica as well as re-exports to Guyana via iso-containers.[23]

An expansion plan announced in 2020 and scheduled for completion in 2023 aimed to increase storage capacity at the Andres LNG Terminal from 160,000 m3 to 280,000 m3.[21] In December 2020, AES authorized POSCO E&C to proceed with construction of a second LNG storage tank with a capacity of 120,000 m3, adjacent to the existing tank. The terminal expansion project also envisioned installation of additional vaporizers and of two truck loading bays.[23] The new truck loading bays began commercial operations in 2022, while completion of the new storage tank remained on schedule for 2023.[24]

Ownership

In December 2023, AES announced that it had sold a 10% stake in its Dominican businesses to AFI Popular, with Grupo Linda and Grupo Estrella each also acquiring a 5% stake.[25][26] Following the sale, AES retained an 80% ownership share in the Andrés terminal.[25][26][27]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. https://maps.app.goo.gl/j95BXrb92h5xDgkv5. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://ijglobal.com/articles/14464/aes-andres-project-in-dominican-republic. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 (PDF) https://giignl.org/wp-content/uploads/2025/06/GIIGNL-Annual-Report-2025.pdf. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 https://www.igu.org/resources/2024-world-lng-report/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 (PDF) https://giignl.org/wp-content/uploads/2024/06/GIIGNL-2024-Annual-Report-1.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://www.ijglobal.com/articles/14464/aes-andres-project-in-dominican-republic. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20210305102119/http://www.aesmcac.com/aesdominicana/?page_id=129&lang=en. {{cite web}}: Missing or empty |title= (help)
  8. https://www.mcdermott.com/What-We-Do/Project-Profiles/AES-LNG-Import-Terminal. {{cite web}}: Missing or empty |title= (help)
  9. http://www.aesmcac.com/aesdominicana/?page_id=129&lang=en. {{cite web}}: Missing or empty |title= (help)
  10. "DomRep converts oil-based power to gas". Argus Media. Archived from the original on 2024-01-25.
  11. 11.0 11.1 11.2 11.3 https://www.prnewswire.com/news-releases/aes-announces-closing-of-previously-announced-and-new-minority-sell-downs-of-lng-businesses-in-the-dominican-republic-and-panama-302021297.html. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 https://lngprime.com/americas/aes-wraps-up-stake-sale-in-two-lng-terminals/100801/. {{cite web}}: Missing or empty |title= (help)
  13. "AES Andres Project in Dominican Republic | Case Studies". IJGlobal. August 11, 2003. Retrieved 2021-01-25.{{cite web}}: CS1 maint: url-status (link)
  14. "AES Andres Project in Dominican Republic | Case Studies | IJGlobal". www.ijglobal.com. Retrieved 2022-07-26.
  15. "AES LNG Import Terminal". MDR. Retrieved 2021-01-25.
  16. "Liquefied natural gas terminal". AES Dominicana. Retrieved 2021-01-25.{{cite web}}: CS1 maint: url-status (link)
  17. Andres LNG terminal to offer trans-shipment, bunkering, LNG World News, 13 Aug. 2015
  18. "Dominican Republic's Andres LNG terminal completes first ever reload". S&P Global Platts. 2017-02-14.{{cite web}}: CS1 maint: url-status (link)
  19. "AES iniciará la construcción de un gasoducto en República Dominicana". Listín Diario. 2018-05-01.{{cite web}}: CS1 maint: url-status (link)
  20. "Energas and AES break the Dominican Republic's reliance on oil". AES. Retrieved 2021-03-11.{{cite web}}: CS1 maint: url-status (link)
  21. 21.0 21.1 "DomRep converts oil-based power to gas". Argus Media. 2020-11-09.{{cite web}}: CS1 maint: url-status (link)
  22. "Nuevo tanque amplía oferta de gas natural". El Nacional. June 29, 2022.
  23. 23.0 23.1 GIIGNL 2021 Annual Report, accessed May 5, 2021
  24. Cite error: Invalid <ref> tag; no text was provided for refs named :322
  25. 25.0 25.1 Cite error: Invalid <ref> tag; no text was provided for refs named :3
  26. 26.0 26.1 Cite error: Invalid <ref> tag; no text was provided for refs named :5
  27. Cite error: Invalid <ref> tag; no text was provided for refs named :12