ArcelorMittal Duisburg steel plant, also known as ArcelorMittal Ruhrort, ArcelorMittal Hochfeld GmbH, ISPAT Stahlwerk Ruhrort GmbH (predecessor), and Mittal Steel Ruhrort GmbH (predecessor), is a 1300 thousand tonnes per annum (TTPA) basic oxygen furnace (BOF) steel plant operating in Duisburg, North Rhine-Westphalia, Germany.

Location

The map below shows the location of the steel plant in Duisburg, North Rhine-Westphalia, Germany.

Loading map...
  • Location: Vohwinkelstrasse 107, 47137 Duisburg, Germany[1]
  • Coordinates (WGS 84): 51.462987, 6.744612 (exact)


Plant Details

Table 1: General Plant Details

Plant status Start date Workforce size Power source
operating[1] 1852[2] 884[3] WindSeeG project[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
ArcelorMittal SA [100%][1] 5000030092 [100%] Arcelormittal Duisburg GmbH[1] 5040949378

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
semi-finished; finished rolled[5] wire rod, reinforcing bars, steel bars, forged products & semi-finished products[5] automotive; tools and machinery[6] 2020[7] 2020[8] basic oxygen furnace (BOF)[5] 2 BOF (2x140-tonne)[9][5][3]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
1300 TTPA[10] 1300 TTPA

Table 5: Actual Crude Steel Production by Year (thousand tonnes per annum):

Year BOF Production EAF Production OHF Production Total (all routes)
2020 870 TTPA[3] 870 TTPA
2021 1000 TTPA[11] 1000 TTPA

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20211223070412/https://duisburg.arcelormittal.com/Ueber-uns/. Archived from the original on 2021-12-23. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20211223071139/https://duisburg.arcelormittal.com/icc/arcelor-duisburg-de/broker.jsp?uMen. Archived from the original on 2021-12-23. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20211223070458/https://duisburg.arcelormittal.com/Ueber-uns/ArcelorMittal-Duisburg/. Archived from the original on 2021-12-23. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20220929002600/https://corporate.arcelormittal.com/media/news-articles/rwe-and-arcelormittal-intend-to-jointly-build-and-operate-offshore-wind-farms-and-hydrogen-facilities-for-low-emissions-steelmaking-1/. Archived from the original on 2022-09-29. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20220922022154/https://barsandrods.arcelormittal.com/mills/duisburg. Archived from the original on 2022-09-22. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20211223070433/https://duisburg.arcelormittal.com/Produkte/. Archived from the original on 2021-12-23. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://web.archive.org/web/20220921194827/https://duisburg.arcelormittal.com/icc/arcelor-duisburg-de/med/f6d/f6d538dc-7e20-6617-98ee-5046092c8280,11111111-1111-1111-1111-111111111111.pdf. Archived from the original (PDF) on 2022-09-21. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://web.archive.org/web/20220922021532/https://duisburg.arcelormittal.com/icc/arcelor-duisburg-de/med/4b6/4b610a11-e455-e571-4d29-73e40f2a4a10,11111111-1111-1111-1111-111111111111.pdf. Archived from the original (PDF) on 2022-09-22. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20210411124429/https://www.viktormacha.com/galerie/arcelormittal-ruhrort-duisburg-332/. Archived from the original on 2021-04-11. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20220922010907/https://www.argusmedia.com/en/news/1777188-arcelormittals-duisburg-site-declares-force-majeure. Archived from the original on 2022-09-22. {{cite web}}: Missing or empty |title= (help)
  11. (PDF) https://corporate.arcelormittal.com/media/3z1ozw5h/arcelor-mittal-fact-book-2021.pdf. {{cite web}}: Missing or empty |title= (help)

Other resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.