Asil Celik Orhangazi steel plant is a steel plant in Orhangazi, Bursa, Türkiye that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Orhangazi, Bursa, Türkiye:
Location: Gemiç Mahallesi Gemiç Sokak No:183 16800, Orhangazi, Bursa, Türkiye
Coordinates (WGS 84 ): 40.42752, 29.270141 (exact)
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
small shareholder(s) [21.7%]; Parsan Makina Parçaları Sanayi AŞ [20.1%]; Güriş Inşaat ve Muhendislik AŞ [19.5%]; Omtaş Otomotiv Transmisyon Aksamı Sanayi ve Ticaret AŞ [5.5%]; Diler Holding AŞ; Yazici Demir Celik Sanayi ve Turizm Ticaret AŞ
not applicable [21.7%]; 4295893630 [20.1%]; 4298249494 [19.5%]; 4298499317 [5.5%]; 5074194745; 4298250812
E100001015587 [21.7%]; E100001016200 [20.1%]; E100000186116 [19.5%]; E100001016203 [5.5%]; E100000120333; E100000130881
Asil Celik Sanayi ve Ticaret AŞ [100%][ 4]
4297981537
E100000130849 [100%]
Table 3: Process and Products
Steel product category
Steel products
Steel sector end users
ISO 14001
ISO 50001
Responsible steel
Main production equipment
crude, semi-finished, finished rolled[ 4]
square, rounds, hexagon bar, flat, slab, ingot, billet, bloom, hot rolled[ 5] [ 4] [ 6]
automotive, building and infrastructure, energy, tools and machinery, transport[ 4]
Expired[ 7]
unknown[ 8]
unknown
EAF
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Electric arc furnace steelmaking capacity
Nominal crude steel capacity (total)
operating
730[ 2] [ 9]
730[ 2] [ 9]
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
EAF production
Other/unknown steel production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
2025
unknown
unknown
Unit Details
Table 6: Electric Arc Furnace Details
Unit name
Status
Start date
Furnace manufacturer and model
Current capacity (ttpa)
Current size (tonnes)
unknown EAF (1)
operating[ 4]
2005[ 6] [ 10]
Danieli[ 10]
730[ 2] [ 9]
70.0[ 4]
Table 7: Electric Arc Furnace Feedstock Details
Unit name
Scrap-based
% scrap
% DRI
% HBI
% sponge iron (unknown if DRI or HBI)
% basic/merchant pig iron
% granulated pig iron
% pig iron (unknown if basic/merchant or granulated)
% other iron
unknown EAF (1)
yes[ 2]
100.00[ 7]
0[ 7]
0[ 7]
0[ 7]
0[ 7]
0[ 7]
0[ 7]
0[ 7]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources