Azna Steel Lorestan plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Azna Steel Lorestan plant (مجتمع فولاد و ذوب آهن ازنا), also known as Azna Steel and Iron Smelting Complex, is a steel plant in Azna, Lorestan, Iran that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Azna, Lorestan, Iran:
- Location: Lorestan Province, Azna, Unnamed Road, FF65+VR8, Iran
- Coordinates (WGS 84): 33.464353, 49.391373 (exact)
Background
The Azna steel plant is planned to have 1.9 million tons per year in Electric Arc Furnace (EAF) steelmaking capacity, split between two furnace units.[1] However, the company has faced legal and financial difficulties that have significantly delayed progress of the first phase of the project, and which were ongoing as of August 2025.[2]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source | Iron ore source |
|---|---|---|---|
| 2020-03[3][4] | 560[4] | unknown | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Azna Steel [100.0%] | unknown [100.0%] | E100000131105 [100.0%] | Azna Steel [100%][5] | unknown | E100000131105 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|---|
| semi-finished[4] | slab, sheet[4] | energy[6] | unknown | unknown | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 700[4] | 700[4] |
| construction | 1200[4] | 1200[4] |
Table 5: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Pellets |
|---|---|
| NF | NF |
Unit Details
Table 6: Electric Arc Furnace Details
| Unit name | Status | Current capacity (ttpa) |
|---|---|---|
| unknown EAF (1) | construction[3] | 1200[4] |
| unknown EAF (2) | announced[7] | 700[4] |
Table 7: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|---|
| unknown EAF (1) | None | unknown | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
| unknown EAF (2) | None | unknown | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Steel Sheet Production Capacity to Expand | FinancialTribune". financialtribune.com. Retrieved 2025-12-03.
- ↑ "توضیح دادگستری استان تهران درباره رفع مشکلات مجتمع فولاد و ذوبآهن ازنا". www.ilna.ir. Retrieved 2025-12-03.
- ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240207181243/https://khdccima.ir/wp-content/uploads/2022/09/LORESTAN.pdf. Archived from the original (PDF) on 2024-02-07.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 https://web.archive.org/web/20220318075354/https://financialtribune.com/articles/domestic-economy/98466/steel-sheet-production-capacity-to-expand. Archived from the original on 2022-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF).
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help) - ↑ https://www.steelorbis.com/steel-news/latest-news/first-phase-of-irans-azna-steel-complex-to-come-on-stream-in-feb-2011-513523.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF).
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help)
