Baosteel Special Steel Co Ltd
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Baosteel Special Steel Co Ltd (宝钢特钢有限公司), also known as Shanghai No. 5 Iron and Steel Plant, is an electric arc furnace (EAF) steel plant operating pre-retirement in Baoshan, Shanghai, China.
Location
The map below shows the exact location of the plant in Baoshan, Shanghai, China:
- Location: No. 1269 Shuichan Road, Wusong Industrial Zone, Baoshan District, Shanghai
- Coordinates (WGS 84): 31.379422, 121.484652 (exact)
Background
The company's production capacity was completely phased out.[1]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Pre-retirement announcement date | Retired date | Workforce size | Power source |
---|---|---|---|---|---|
Operating pre-retirement[2] | 1958[3] | 2022-05-25[4] | 2023[5][4] | 529[2] | 150MW Gas-fired Power Generation Unit[6] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
China Baowu Steel Group Co Ltd [100.0%] | 5000039946 [100%] | E100001000472 [100%] | Baosteel Special Steel Co., Ltd.[2] | 5050719757 | E100000127209 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | Main production equipment | Detailed production equipment |
---|---|---|---|---|
finished rolled[7] | plates, tubes, rods, wires, coils, belts, cakes, rings, and profiles[7] | automotive; building and infrastructure; tools and machinery[8] | EAF[9] | 2 EAF (1x40-tonne, 1x60-tonne)[9][10] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating pre-retirement | 500 TTPA[5][5] | 500 TTPA[5][5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "宝钢特钢有限公司资产处置现场拆除工程安全能源环保及治安保卫管理责任协议书.docx-原创力文档". max.book118.com. Retrieved 2024-12-03.
- ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220110222819/https://www.qcc.com/firm/4b397b3d80745922ae0a4c744f7e5bd0.html. Archived from the original on 10 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://www.baosteel-specialsteel.com/about/19-cn.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240119044855/https://jx.ah.gov.cn/public/6991/146677781.html. Archived from the original on 19 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 (PDF) http://jx.ah.gov.cn/group6/M00/05/A5/wKg8BmKPPY-AVrGzAAEzDC6KFeY067.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.163.com/dy/article/FNFL6APB0534FSTF.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20220103082840/http://cndfsb.cn/ggqy/22607.htm. Archived from the original on 03 January 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%AE%9D%E9%92%A2%E7%89%B9%E9%92%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220318094418/http://149210.fm086.com/. Archived from the original on 18 March 2022.
{{cite web}}
: Missing or empty|title=
(help)