Bekezela Colliery
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Bekezela Colliery is a proposed coal mine in Springs, Gauteng, South Africa.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Bekezela Colliery | Springs, Gauteng, South Africa[1] | -26.24262131, 28.51242532 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Project Type | Project Phase | Opening Year | Closing Year |
---|---|---|---|---|---|
Proposed[2] | Construction[1] | New | Stage 2 | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
5[1] | – | – | Surface | Open Pit[1] | – | 60.0* | – |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
– | – | – | – | Bituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Canyon Coal Pty Ltd [100%][3] | Menar | South Africa |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker May 2025 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Ukufisa Colliery is a surface coal mine owned by Canyon Coal in Springs, Gauteng, South Africa.[4] Mining at Canyon Coal's Ukufisa mine started in 2018.
- Operator: Canyon Coal
- Owner: Canyon Coal
- Location: Springs, Gauteng Province, South Africa
- Coordinates: -26.24403044, 28.51179853 (Approximate)
- Status: Operating
- Production Capacity: 7.2 million tonnes per annum (Mtpa)[5]
- Total Resource:
- Mineable Reserves: 170 million tonnes (2017)[4]
- Coal Type: Bituminous (Thermal)
- Mine Type: Surface, opencast
- Start Year: 2018[6]
- Source of Financing:
Extension
In 2019, Canyon Coal began developing phase 2 of the Ukufisa mine. This project, which has been renamed "Bekezela Colliery," is located on the Palmietkuilen farm in the town of Springs, and sits adjacent to the phase 1 section of the Ukufisa mine.[5] [6] According to Canyon Coal, it will extend Ukufisa's life of mine, which was originally estimated to be around 5 years.[5]
Following the commissioning of Bekezela, the Ukufisa phase 1 site will function as a satellite operation for about five years, with the main mine infrastructure being located at phase 2's Bekezela site. RoM coal will be trucked from Ukufisa 1 to be processed at Ukufisa 2, together with the RoM from the latter.[7]. The Bekezela mine's target run-of-mine production is set at 600,000 tonnes per month, and its life of mine is estimated at 22 years.[5]
Bekezela was granted environmental approval in March 2019, and construction was slated to start before the close of 2019, with first coal production expected by Q1 of 2020.[7] However, as of November 2022, it is unclear whether or not the extension project is operational.
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240309032530/https://www.miningweekly.com/article/new-colliery-construction-planned-for-early-2022-2021-12-10. Archived from the original on 09 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240309031259/https://www.miningweekly.com/print-version/menarcoal-and-anthraciteprojects-south-africa-update-2023-05-05. Archived from the original on 09 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240723043933/https://www.canyoncoal.com/the-maroon-post-blog/coo-message. Archived from the original on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 "Growth-Focused Canyon Coal Sees Silver Lining In Tough Mining Sector", Canyon Coal website, 28 Sept. 2017.
- ↑ 5.0 5.1 5.2 5.3 "COO's Message - Edition 009", Canyon Coal website, accessed November 2022.
- ↑ 6.0 6.1 "Chairperson's View - Edition 003", Canyon Coal website, accessed November 2022.
- ↑ 7.0 7.1 "Ukufisa Phase 2 to start production in 2020", Creamer Media's Mining Weekly, 27 Sept. 2019