Centauro del Norte Gas Pipeline, also known as the Sonora-Baja California Gas Pipeline or by its Spanish name Gasoducto Centauro del Norte (GCN), is a gas pipeline under construction in the states of Baja California and Sonora, Mexico.

Location

The Centauro del Norte pipeline is designed to run from a junction with the Rosarito gas pipeline near Mexicali (Baja California state) to the Pitiquito compressor station in Caborca (Sonora state)[1], supplying fossil gas to a key industrial corridor in northwestern Mexico not served by the existing Rosarito, Samalayuca-Sásabe and Sásabe-Guaymas pipelines. Developers have described the project as a continuation of the Samalayuca-Sásabe gas pipeline.[2]

Loading map...

Project details

Phase 1

Phase 2

Background

In February 2023, Sempra and Carso Energy announced that they had reached a preliminary, non-binding agreement with Mexico's federal electricity commission CFE to build a new pipeline serving the states of Sonora and Baja California. Multiple sources reported that the pipeline's length would be approximately 281 miles[10] (450 kilometers)[11][12], but few other details were available as of August 2023. According to the developers, the new pipeline would connect to Carso Energy's Samalayuca-Sásabe Gas Pipeline and Sempra Energy's Sásabe-Guaymas Gas Pipeline, providing a more secure, efficient, competitive, and reliable natural gas supply to CFE power plants and other industries between Sásabe (Sonora) and Algodones (Baja California) in northwestern Mexico.[13]

In December 2023, Carso Energy and CFE (Mexico's federal electricity commission) confirmed that they had signed an investment and development agreement and a gas transport contract for the new pipeline, which was to extend approximately 416 km from Sásabe to Mexicali.[2]

Phase 1

Phase 1 of the Centauro del Norte project is designed to run from an interconnection with Sempra's Rosarito pipeline near Mexicali (Baja California) to San Luis Río Colorado in Sonora state.[1][5][7] This phase will provide gas to new CFE power stations under development in northwestern Mexico, including the CCC González Ortega power station and the CCC San Luis Río Colorado power station.[5][10][14] As of December 2024, construction had begun on the 77 km Phase 1.[4] Early announcements anticipated that Phase 1 would start transporting gas as early as May 2025[8][3]; however, as of August 2025 there was no indication that the pipeline had begun operating.

Phase 2

Phase 2 of the pipeline would continue east from San Luis Río Colorado to connect with the Samalayuca-Sásabe and Sásabe-Guaymas pipelines at the Pitiquito compressor station near Caborca (Sonora state).[1][4][6] As of December 2024, construction of the 365 km Phase 2 was expected to begin in 2027.[4]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "Directrices Generales de Desarrollo Urbano para el proyecto Gasoducto Centauro del Norte, tramo I, Municipio de Mexicali, Baja California (pp 184, 240)" (PDF). Periódico Oficial del Estado de Baja California. 2024-09-06.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Carso Energy firma convenio de inversión para desarrollo y construcción de la continuación del gasoducto Samalayuca-Sásabe - Grupo Carso". Carso Energy. 2023-12-21.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 "En mayo de 2025 entra en operación gasoducto Centauro del Norte, en Baja California". Energía a Debate. 2024-09-12. Retrieved 2025-08-18.{{cite web}}: CS1 maint: url-status (link)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 "Spotlight on Mexico: Construction on Centauro del Norte Pipeline Begins". Pipeline & Gas Journal. 2024-12-31.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 "Sonora-Baja California Natural Gas Pipeline Could Transform Northwest Mexico Energy Infrastructure". NGI (Natural Gas Intelligence). 2024-12-24.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 "Grupo Carso construirá gasoducto Centauro del Norte en Baja California". Energía a Debate. 2024-09-09.{{cite web}}: CS1 maint: url-status (link)
  7. 7.0 7.1 "El gas natural en México: implicaciones para la política energética y la sostenibilidad (p 79)" (PDF). Consejo Nacional de Humanidades, Ciencias y Tecnologías (Conahcyt) Programa Nacional Estratégico de Energía y Cambio Climático (Pronace). 2025-04-30. {{cite web}}: line feed character in |website= at position 67 (help)CS1 maint: url-status (link)
  8. 8.0 8.1 "Natural Gas Demand Growth Seen Leading to 'Overly Tight' Conditions in Northwestern Mexico". NGI (Natural Gas Intelligence). 2025-05-29.{{cite web}}: CS1 maint: url-status (link)
  9. "Mexico Plans Natural Gas Pipeline Connecting Sonora and Baja California to Meet Rising Demand". Natural Gas Intel. 2023-02-14.{{cite web}}: CS1 maint: url-status (link)
  10. 10.0 10.1 "Sempra Infrastructure Signs Memorandum of Understanding with CFE and Carso to Develop Natural Gas Transportation Infrastructure in Mexico - Sempra Infrastructure". Sempra Infrastructure. February 14, 2023.{{cite web}}: CS1 maint: url-status (link)
  11. "Carso y Sempra acuerdan nuevo gasoducto con CFE". El Economista. February 14, 2023.{{cite web}}: CS1 maint: url-status (link)
  12. "Sempra, Carso y CFE firman memorándum; planean gasoducto en Sonora y BC". Forbes México. February 14, 2023.
  13. "La CFE firma Memorándum de Entendimiento con CARSO y Sempra Infraestructura para sentar las bases de una potencial Alianza Estratégica a fin de desarrollar infraestructura de transporte de gas natural para fortalecer la seguridad energética de México". Sempra Infraestructura. 2023-02-14.{{cite web}}: CS1 maint: url-status (link)
  14. "La CFE firma alianza estratégica con Grupo Carso, S.A.B. de C.V. y sus subsidiarias (Carso), para el desarrollo, construcción y operación de un gasoducto en el noroeste del país". Portal CFE. 2023-12-21. {{cite web}}: line feed character in |title= at position 65 (help)CS1 maint: url-status (link)