Central Rich and Lean Gas Pipeline is an operating gas pipeline in Oman.[1]

Location

The pipeline extends from Block Valve Station 09 near Al Kamil to the Oman LNG terminal near Sur.[1]

Project Details

  • Operator: OQGN[1]
  • Capacity: 6 bcm/year[3]
  • Length: 65 km[3]
  • Diameter: 48 in[3]
  • Status: Operating[4]
  • Start year: 2025[4]
  • Cost: US$104 million[5]

Background

In 2021, a contract for the Central Rich and Lean Gas Segregation Project was awarded to Galfar for US$104 million. The project entailed the addition of a 65 km, 48 in loop line from Block Valve Station 09 to Sur, where it would serve Oman LNG with an additional 6 bcm/year. It was completed in 2025. Per OQGN's maps, this pipeline connects from the SNGP Loop.[5][3][4][1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "Leading the Way in Gas Transportation" (PDF). oqgn.om. 2024. Retrieved 2025-09-05.{{cite web}}: CS1 maint: url-status (link)
  2. "OQGN". oqgn.om. Retrieved 2025-09-08.
  3. 3.0 3.1 3.2 3.3 Network, BNC. "BNC Network - Construction Intelligence Platform". www.bncnetwork.net. Retrieved 2025-09-08.
  4. 4.0 4.1 4.2 PRABHU, CONRAD (2025-09-05). "Oman's gas network to expand to 4,623km by 2027". Oman Observer. Retrieved 2025-09-08.
  5. 5.0 5.1 Projects, SaudiGulf (2021-09-12). "Galfar awarded $104 million Pipeline Contract from OQ". SaudiGulf Projects. Retrieved 2025-09-08.