Century Steel Khyber plant

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Century Steel Khyber plant is a 500 thousand tonnes per annum (TTPA) steel plant under construction in Nowshera, Khyber Pakhtunkhwa, Pakistan.

Location

The map below shows the location of the steel plant in Nowshera, Khyber Pakhtunkhwa, Pakistan.

Loading map...
  • Location: Plot No 07-A, Rashakai, Special Economic Zone, Nowshera, Pakistan[1][2]
  • Coordinates (WGS 84): 34.124213, 72.019181 (approximate)

Background

Fuzhou Julitaihe International Company of China is building the Century Steel Ltd plant in the Rashakai Special Economic Zone, Pakistan. The plant is expected to have a capacity of 1.5 mtpa and is being constructed in three phases with with the first phase expected to be operational in 2023 with an initial capacity of 500 ttpa.[3]

Plant Details

Table 1: General Plant Details

Plant status Construction date Start date Workforce size
construction[2] 2021[4][5] 2023[6] 1000[7]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Owner Owner company PermID
Jincheng industry development Pte ltd [100%][1] GEM0000548 [100%] Century Steel Pvt Ltd[1] GEM0000500

Table 3: Process and Products

Steel product category Steel products
finished rolled[8] beams, plates, tube, bars[9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum):

Nominal crude steel capacity (total)
500 TTPA[6][2]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum):

Nominal iron capacity (total)
>0 TTPA[9]

Articles and Resources

Resources

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20221002095859/http://centurysteel.pk/about-us. Archived from the original on 2022-10-02. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  3. "Century Steel Plant construction at RSEZ in full swing". www.gwadarpro.pk. Retrieved 2023-10-30.
  4. https://web.archive.org/web/20221002101029/http://centurysteel.pk/century-steel-blogs/cpec-projects-are-progressing-with-fast-pace-during-tenure-of-the-incumbent-government-minister-pdsi-asad-umar. Archived from the original on 2022-10-02. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220828124720/https://tribune.com.pk/story/2353507/11-enterprises-setting-up-units-in-rashakai-sez. Archived from the original on 2022-08-28. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20220925041730/https://gwadarpro.pk/1566234038289035266/century-steel-plant-construction-at-rsez-in-full-swing. Archived from the original on 2022-09-25. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20211118183653/http://cpecinfo.com/chinese-company-century-steel-to-provide-pakistan-with-15mn-tons-of-steel/. Archived from the original on 2021-11-18. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20220123041440/https://tribune.com.pk/story/2340026/steel-unit-to-start-production-at-rashakai-sez-soon. Archived from the original on 2022-01-23. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20221002091557/http://centurysteel.pk/steel-services. Archived from the original on 2022-10-02. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.