Cerrejón Coal Mine
| This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
| Related-articles: |
Cerrejón Coal Mine (Mina de carbón El Cerrejón) is an operating coal mine in Albania, Barrancas, Hatonuevo, La Guajira, Colombia.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Cerrejón Coal Mine | Albania, Barrancas, Hatonuevo, La Guajira, Colombia | 11.033968, -72.662926 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Operating[1] | – | 1985 | 2034 (planned)[2] |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| – | 16.8[2] | 2025[2] | Surface | Open Pit | 699 | 60* | 12000[2] |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| 310 | – | 8266.8[3] | Cesar-Ranchería Basin | Bituminous | Thermal | Terminal (Export) |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Carbones del Cerrejon Ltd [100.0%][4][5] | Glencore | Switzerland |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| ROM[6] | 31.9[7] | 30.7[8] | 25.8[9] | 12.4[10] | 23.4[11] | 19.7[1] | 22[6] | 19.2[3] | 16.8[2] |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Cerrejón coal mine or minera del Cerrejón is a surface mine, owned by the Cerrejón Coal Company, a subsidiary of Glencore[12][13], near the village of Albania in the La Guajira department of Colombia.
Cerrejón is the largest coal mine in Latin America and the tenth biggest in the world.[14]
In 2011, the mine underwent an expansion, called the Cerrejon P-40 Expansion. The Cerrejón mine comprises four zones: the North Zone, the Central Zone, the Patilla area and the South Zone.[15]
BHP Billiton boasted on its website in 2011 that "Cerrejón's open-cut mines now represent one of the biggest earthmoving operations worldwide. Approximately one million tonnes of material are moved every day, 365 days per year. To achieve this, the operation runs one of the biggest fleets of shovels and trucks in the world. The company employs nearly 4,000 people, with approximately the same number engaged as contractors."[15]
Ownership
As of August 2010, Xstrata Coal stated on its website that "in December 1976, an Association Contract was signed between Carbocol S.A., a state owned coal company, and Intercor, an ExxonMobil affiliate, for the development of Cerrejón North Zone. In January 1999, an agreement with the Government of Colombia extended this phase an additional 25 years more, until 2034.[16] In November 2000, the Colombian Government sold Carbocol S.A.’s (50%) participation in Cerrejón North Zone Association Contract, to a consortium made up of subsidiary companies of BHP Billiton plc, Anglo American plc and Glencore International AG. In February of 2002, the consortium acquired the remaining 50% from Intercor and merged Intercor with Carbones del Cerrejón S.A to create Carbones del Cerrejón LLC, Cerrejón."[16]
In June 2021, Glencore announced that it had reached an agreement to acquire BHP and Anglo American's 33.3% stakes in the Cerrejón mine.[12] In January 2022, Glencore completed the acquisition, assuming 100% control of the mine.[13]
Production
Production at the Cerrejón mine grew steadily throughout the early 2000s, reaching its peak between 2012 and 2014; BHP Billiton stated in its 2014 Annual Report that total production in the 2013/2014 financial year (July 2013-June 2014) was 36.9 million tonnes.[17]
In its 2020 annual report, BHP Billiton reported that production declined by 33% in 2019-2020 due to worker strikes and the impact of the COVID-19 pandemic.[18] BHP Billiton's 2021 report indicated that production declined a further 30% in 2020-2021, in part due to a 91-day strike.[19] However, by the end of 2021, the Cerrejón Coal Company reported that annual production had recovered, falling only about 10% shy of 2019 levels.[20][21] In the company's 2022 Sustainability Report, Cerrejón described impaired operations due to increased rainfall during the La Niña year and challenges due to blockades in 2022 resulting in a decrease in coal production that year.[22]
Cerrejón produced 22.0 million tonnes in 2023 and 19.2 million tonnes in 2024, a 13% decline attributed to permit delays, community blockades, and unusually heavy rainfall in the fourth quarter of the year. In 2024 the company paid USD 221 million in royalties to the Colombian government and USD 17 million in taxes and contributions to La Guajira and municipalities in its area of influence.[23] In March 2025, Cerrejón announced a further planned reduction of 5 to 10 million tonnes annually, citing unsustainable thermal coal shipping costs to Asian markets and an escalating pattern of railway blockades — 333 in 2024 alone, preventing coal transport to port for 135 days of that year, along with five explosive attacks on the railway in the preceding three months. The company stated that annual production for 2025 was estimated at between 11 and 16 million tonnes, subject to market conditions.[24]
Cerrejon ended 2025 with production of 16.8 million tonnes, a 12.5% decline from 19.2 million tonnes in 2024, compared to a peak of 36.9 million tonnes in 2013-2014.[25]
Table 1: Annual Production and Exports (January to December) - Cerrejón Mine
| Year | Total Production (Mtpa) | Total Exports (Mtpa) |
|---|---|---|
| 2025 | 16.8[25] | -- |
| 2024 | 19.2[23] | -- |
| 2023 | 22[23] | -- |
| 2022 | 19.7[22] | -- |
| 2021 | 23.4[20][21] | 23.36[26] |
| 2020 | 12.4[27] | 13.6[27] |
| 2019 | 25.8[28] | 26.3[28] |
| 2018 | 30.7[29] | 30.5[29] |
| 2017 | 31.9[30] | 31.7[30] |
| 2016 | 31.6[31] | 32.4[32] |
| 2015 | 33.2[33] | 33.4[33] |
| 2014 | 33.7[34] | 34.2[34] |
| 2013 | 32.6[31] | 33.5[35] |
| 2012 | 34.6[36] | 32.8[36] |
| 2011 | 32.3[37] | 32.03[37] |
| 2010 | 30.2[38] | 31.4[38] |
| 2009 | 30.6[39] | 30.3[39] |
| 2008 | 31.2[40] | 31.4[40] |
| 2007 | 29.6[41] | 29.8[41] |
| 2006 | 28.4[42] | 27.5[42] |
| 2005 | 26[43] | 25.5[43] |
| Fiscal Year | Total Production (Mtpa) | BHP Billiton Share of Production (Mtpa) |
|---|---|---|
| Jul 2020-Jun 2021 | 14.892 | 4.964[19] |
| Jul 2019-Jun 2020 | 21.345 | 7.115[18] |
| Jul 2018-Jun 2019 | 27.690 | 9.230[44] |
| Jul 2017-Jun 2018 | 31.848 | 10.616[45] |
| Jul 2016-Jun 2017 | 32.877 | 10.959[46] |
| Jul 2015-Jun 2016 | 30.282 | 10.094[47] |
| Jul 2014-Jun 2015 | 33.873 | 11.291[47] |
| Jul 2013-Jun 2014 | 36.996 | 12.332[47] |
| Jul 2012-Jun 2013 | 30.051 | 10.017[48] |
| Jul 2011-Jun 2012 | 34.989 | 11.663[48] |
| Jul 2010-Jun 2011 | 29.667 | 9.889[49] |
| Jul 2009-Jun 2010 | 30.465 | 10.155[49] |
Exports
Coal from Cerrejón was originally marketed by CMC Coal Marketing Company, a company owned equally by BHP Billiton plc, Anglo American plc and Xstrata plc, headquartered in Dublin (Ireland) with a subsidiary office in Atlanta (USA).[50][51]
In 2009, Cerrejón Coal Company stated that 56% of its production was exported to Europe, 17% to North America, 12% to Central and South America and 15% to "other destinations".[52] As of February 2011 BHP Billiton's website confirmed that coal from Cerrejón was "exported largely to Europe, but also to the USA and South America."[15] In its 2020 annual report, the Cerrejón Coal Company stated that 43% of the mine's exports were shipped to the Mediterranean region, 26% to the Americas, 15% to Asia, and 15% to other countries in non-Mediterranean Europe.[27]
As of March 2015, the CMC Coal Marketing Company website indicated that the Cerrejón mine had exported over 500 million tonnes since 1985[50], while the Cerrejón Coal Company's 2016 annual report stated that coal exports from Cerrejón between 1985 and 2016 exceeded 650 million tonnes.[32]
Reserves and Reserve Life
As of August 2010, Xstrata Coal stated that the mine employed 8,400 people and had a "reserve base in excess of 900 million tonnes."[16]
As of August 2011, according to the mine's owners, Cerrejón had a resource base of about 5 billion tons, of which 2.1 billion tons had already been measured and indicated to be of export quality, making Cerrejón one of the largest coal deposits in the world.[53]
As the global price of thermal coal has plummeted since 2011, the reserve life of the mine - even before the P40 expansion was fully commissioned - has been substantially truncated. In its 2011 annual report BHP Billiton stated that the mine had a reserve life of 23 years.[49] In each of its three subsequent annual reports the company dropped the reserve life by two years.[48][54][55] As of its 2014 annual report, BHP Billiton stated that the reserve life of the mine was 17 years.[55] The company stated that the reason for the change between the 2013 and 2014 estimate was that "due to an increased nominated production rate from 40 Mtpa in FY2013 to 41.5 Mtpa in FY2014."[55]
In its 2014 annual report, BHP Billiton stated that Cerrejón had proved marketable coal reserves of 610 million tonnes with the coal having an ash content of 9.4%, 33.8% volatile matter, 0.6% sulfur and an average energy content of 6180 kcal/kg.[55]
BHP Billiton's 2019 annual report stated that Cerrejón's Colombian coal mining leases were set to expire progressively between 2028 and 2034, noting that no further production was scheduled at the Cerrejón mine beyond 2033.[44]
Mine closure
Cerrejón's mining concessions were set to expire in February 2034, at which point the company committed to handing over all assets, infrastructure, and operating areas to the Colombian State. As of 2024, cumulative land rehabilitation since the start of operations reached 5,200 hectares, with 3.7 million native tropical dry forest trees planted since 1990. The company's Closure and Reversion Plan was benchmarked against the International Council on Mining and Metals (ICMM) Closure Maturity Framework.[23]
In May 2026, Colombia's Ministry of Mines and Energy announced it would invite Glencore to participate in talks with La Guajira provincial authorities and community representatives to discuss the planned closure of the mine and a just transition for workers and local communities, including potential investments in energy, workforce retraining, and clean energy ventures. Minister of Mines and Energy Edwin Palma stated that discussions need not wait for the concession to expire.[25] In June 2026, Cerrejon declared force majeure on June 1 after community protests blocked the railway line connecting the mine to the Puerto Bolivar export terminal, disrupting fuel supplies to mining operations. Cerrejon stated there had been 80 blockades of the rail line that year. A Colombian government minister attended meetings with protest leaders on June 4, and mining resumed on June 3. On June 5, a coalition of organisations including Methodist Church bodies in Colombia, Great Britain and Ireland filed a complaint under the OECD Guidelines for Multinational Enterprises on Responsible Business Conduct with the UK government over HSBC's financing of Glencore's Cerrejon mine, calling on the UK government to assess whether HSBC's support for the mine was consistent with the OECD Guidelines.[56][57]
Environmental & Human Rights Impact
Environmentalists, activists and academics have documented a plethora of negative impacts of the Cerrejón mine on local communities and ecosystems, including forcible displacement of the Afro-descendant Tabaco people, water pollution, and damage to the traditional agricultural economy.[58]
In July 2020, UNDARK Magazine reported "conflict with the local community, arising from both the pollution as well as infrastructure decisions that, the Wayuu say, have favored Cerrejón’s water needs over their own." UNDARK's report noted that a "comprehensive environmental study by the Institute for Development and Peace Studies (Indepaz), a non-governmental organization based in Bogotá, for example, found high levels of heavy metal contamination in local soil and water samples, as well as high levels of airborne particulate matter around the area of Cerrejón." In response "Cerrejón officials called into question, among other things, the group’s testing methodologies and equipment."[59]
In September 2020, the United Nations Special Rapporteur for Human Rights and the Environment, David Boyd, called for the suspension of the mine “until it can be shown to be safe.”[60]
In January 2021, it was announced that BHP, Glencore and Anglo American would face an investigation over the mine's environmental and human rights impacts. Government officials from Australia, Ireland, Switzerland and the UK will be responsible for the investigation of the impacts of the mine under the terms of the OECD (Organization for Economic Co-operation and Development) Guidelines for Multinational Enterprises which requires member countries to investigate alleged breaches by companies based within their jurisdiction.[60] In conjunction with the announcement, environmental and human rights activists in Australia, Switzerland, Ireland and the UK filed simultaneous complaints with the OECD calling for closure of the Cerrejón mine. The complaints cited Cerrejón's forced displacement of Indigenous and Afro-Colombian communities, along with high rates of air and water pollution, cancer and metal intoxication affecting communities in the vicinity of the mine.[61]
In January 2022, the Swiss, Australian and UK National Central Points (NCPs) issued initial assessments confirming that the complaints deal with a credible issue and should progress.[62][63][64]
Labor Disputes and Blockades
In May 2021 Cerrejón coal announced that it had suspended operations at the mine as the result of a railway blockade organized by former workers.[65]

In September 2022, the communities of Papayal, Manantialito, Barrancón, Vereda de Sierra Azul, Cocotazo, San Francisco, Tamaquito II, and other resettled communities organized to block the Cerrejón mine's southern operation, stating that the mining company had not complied with prior judgments and refused to work with the community on issues such as access to water, social investment, and jobs. As of September 6, peaceful roadblocks by indigenous activists had reduced Cerrejón's thermal coal production by 70%.[66][67][68]
Methane Plumes Detected Nearby
Global Energy Monitor researchers analyze satellite-detected methane plumes in order to determine whether they have been observed at or near the site of GEM energy assets. The satellite data provider creates imagery of individual methane plumes and estimates their emission rates at the time of observation. GEM has reviewed many of these plume detections against Google Earth imagery and GEM’s own energy infrastructure tracker data. The following table lists methane plumes which are associated with the energy asset or facility based on distance and manual review. (A full description of the analysis process is available in the Global Methane Emitters Tracker methodology wiki page.)
Table M1: Plume details
| Observation date | Satellite data provider | Location of plume origin | Methane emissions rate | Additional plume information |
|---|---|---|---|---|
| 2023-03-18T18:01:59+00 | CarbonMapper, ang20230318t180159-A | 11.04417, -72.6437[69] | 3686.66 kg/hr[69] | La Guajira Department Methane Observation 2023-03-18, 1 |
| 2023-03-18T18:01:59+00 | CarbonMapper, ang20230318t180159-B | 11.12781, -72.5663[69] | 1175.178 kg/hr[69] | La Guajira Department Methane Observation 2023-03-18, 2 |
| 2023-03-18T18:01:59+00 | CarbonMapper, ang20230318t180159-C | 11.12215, -72.5657[69] | 527.7846 kg/hr[69] | La Guajira Department Methane Observation 2023-03-18, 3 |
| 2023-03-18T18:01:59+00 | CarbonMapper, ang20230318t180159-D | 11.12361, -72.569[69] | –[69] | La Guajira Department Methane Observation 2023-03-18, 4 |
| 2023-03-19T20:54:35+00 | CarbonMapper, ang20230319t205435-B | 11.12778, -72.5658[69] | –[69] | La Guajira Department Methane Observation 2023-03-19, 1 |
| 2023-03-19T21:05:29+00 | CarbonMapper, ang20230319t210529-A | 11.12781, -72.5663[69] | –[69] | La Guajira Department Methane Observation 2023-03-19, 2 |
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://www.cerrejon.com/sites/default/files/2023-06/SUSTAINABILITY-REPORT-2022%20.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://www.rumbominero.com/colombia/colombia-presiona-a-glencore-acelerar-cierre-de-mina-cerrejon/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 (PDF) https://www.cerrejon.com/.rest/api/v1/documents/fbd915d5948c81ac05eb082c7962d7f4/sustainability-report-2024-f.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "History". www.cerrejon.com. Archived from the original on 2024-01-25. Retrieved 2023-07-12.
{{cite web}}: Text "Cerrejón" ignored (help) - ↑ https://web.archive.org/web/20260312073408/https://www.cerrejon.com/en/que-hacemos/mina. Archived from the original on 12 March 2026.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 (PDF) https://www.cerrejon.com/sites/default/files/2024-07/SUSTAINABILITY%20REPORT%202023%20Eng.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.cerrejon.com/sites/default/files/2021-09/sustainability-2017.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.cerrejon.com/sites/default/files/2021-09/sustainability-2018.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.cerrejon.com/sites/default/files/2021-09/sustainability-2019.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.cerrejon.com/sites/default/files/2021-09/sustainability-2020.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.cerrejon.com/sites/default/files/2022-09/SUSTAINABILITY%20REPORT%202021-FINAL_compressed_0.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 "Glencore agrees to acquire JV partners' shares in the Cerrejón mine and strengthens climate commitments". Glencore. June 28, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ 13.0 13.1 "Glencore acquires Cerrejón coal mine in Colombia". Mining Technology. January 12, 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ Mining Technologies The 10 biggest coal mines in the world Analysis by Mining Technologies, Oct 20, 2013
- ↑ 15.0 15.1 15.2 BHP Billiton, "Cerrejon Coal Company", BHP Billiton website, archived page from February 11, 2011.
- ↑ 16.0 16.1 16.2 Xstrata Coal, "Cerrejòn", Xstrata Coal website, accessed August 2010.
- ↑ BHP Billiton, "Annual Report 2014, BHP Billiton, September 2014, page 18.
- ↑ 18.0 18.1 "Annual Report 2020" (PDF). BHP. September 2021. Retrieved 29 September 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ 19.0 19.1 "Annual Report 2021" (PDF). BHP. Retrieved 29 September 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ 20.0 20.1 "Colombia Cerrejon's coal output soars 89% in 2021". Mining.com. February 28, 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ 21.0 21.1 "Sustainability Report 2021 (p 7)" (PDF). Cerrejón Coal Company. January 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ 22.0 22.1 Sustainability Report 2022, Cerrejón Coal Company, June 2023.
- ↑ 23.0 23.1 23.2 23.3 "Sustainability Report 2024" (PDF). Cerrejón. Retrieved March 25, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Cerrejón reducirá producción de carbón térmico en Colombia". Valora Analitik. March 25, 2025. Retrieved March 25, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ 25.0 25.1 25.2 Colombia urges Glencore to discuss Cerrejon coal mine closure with local authorities, Mining Weekly, May 10, 2026
- ↑ "Colombia's 2021 thermal coal exports up 6% on yr". SX Coal. January 20, 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ 27.0 27.1 27.2 "Sustainability Report 2020 (pp 10, 86)" (PDF). Cerrejón Coal Company. January 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ 28.0 28.1 "Sustainability Report 2019 (pp 18-19)" (PDF). Cerrejón Coal Company. January 2020.
{{cite web}}: CS1 maint: url-status (link) - ↑ 29.0 29.1 "Sustainability Report 2018 (p 2)" (PDF). Cerrejón Coal Company. January 2019.
{{cite web}}: CS1 maint: url-status (link) - ↑ 30.0 30.1 "Sustainability Report 2017 (p 9)" (PDF). Cerrejón Coal Company. January 2018.
{{cite web}}: CS1 maint: url-status (link) - ↑ 31.0 31.1 "Our Numbers: Production". Cerrejón Coal Company. Retrieved 2023-01-25.
{{cite web}}: CS1 maint: url-status (link) - ↑ 32.0 32.1 "Sustainability Report 2016 (p 5)" (PDF). Cerrejón Coal Company. January 2017.
{{cite web}}: CS1 maint: url-status (link) - ↑ 33.0 33.1 "Sustainability Report 2015 (p 7)" (PDF). Cerrejón Coal Company. January 2016.
{{cite web}}: CS1 maint: url-status (link) - ↑ 34.0 34.1 "Sustainability Report 2014 (p 20)" (PDF). Cerrejón Coal Company. January 2015.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Sustainability Report 2013 (pp 9, 17)" (PDF). Cerrejón Coal Company. January 2014.
{{cite web}}: CS1 maint: url-status (link) - ↑ 36.0 36.1 "Sustainability Report 2012 (p 4)" (PDF). Cerrejón Coal Company. January 2013.
{{cite web}}: CS1 maint: url-status (link) - ↑ 37.0 37.1 "Sustainability Report 2011 (pp 8, 11, 19)" (PDF). Cerrejón Coal Company. January 2012.
{{cite web}}: CS1 maint: url-status (link) - ↑ 38.0 38.1 "Sustainability Report 2010 (p 5)" (PDF). Cerrejón Coal Company. January 2011.
{{cite web}}: CS1 maint: url-status (link) - ↑ 39.0 39.1 "Sustainability Report 2009 (p 34)" (PDF). Cerrejón Coal Company. January 2010.
{{cite web}}: CS1 maint: url-status (link) - ↑ 40.0 40.1 "Sustainability Report 2008 (p 21)" (PDF). Cerrejón Coal Company. January 2009.
{{cite web}}: CS1 maint: url-status (link) - ↑ 41.0 41.1 "Sustainability Report 2007 (pp 52-53)" (PDF). Cerrejón Coal Company. January 2008.
{{cite web}}: CS1 maint: url-status (link) - ↑ 42.0 42.1 "Sustainability Report 2006 (pp 21, 73)" (PDF). Cerrejón Coal Company. January 2007.
{{cite web}}: CS1 maint: url-status (link) - ↑ 43.0 43.1 "Sustainability Report 2005 (p 15)" (PDF). Cerrejón Coal Company. January 2006.
{{cite web}}: CS1 maint: url-status (link) - ↑ 44.0 44.1 "Annual Report 2019" (PDF). BHP. January 2020.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Annual Report 2018" (PDF). BHP. January 2019.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Annual Report 2017" (PDF). BHP. January 2018.
{{cite web}}: CS1 maint: url-status (link) - ↑ 47.0 47.1 47.2 "Annual Report 2016" (PDF). BHP Billiton. January 2017.
{{cite web}}: CS1 maint: url-status (link) - ↑ 48.0 48.1 48.2 "Annual Report 2013" (PDF). BHP Billiton. January 2014.
{{cite web}}: CS1 maint: url-status (link) - ↑ 49.0 49.1 49.2 "Annual Report 2011" (PDF). BHP Billiton. January 2012.
{{cite web}}: CS1 maint: url-status (link) - ↑ 50.0 50.1 "CMC Coal Marketing Company", CMC Coal Marketing Company website, accessed March 2015.
- ↑ Cerrjon Coal Coampany, "Marketing", Cerrjon Coal Company website, accessed June 2010.
- ↑ Cerrejon Coal Company, "Exports volume", Cerrejon Coal Company website, accessed June 2010.
- ↑ Alex MacDonald, "U.K.-listed miners OK $1.3B Colombia coal plan", MarketWatch, August 18, 2011.
- ↑ "Annual Report 2012" (PDF). BHP Billiton. January 2013.
{{cite web}}: CS1 maint: url-status (link) - ↑ 55.0 55.1 55.2 55.3 "Annual Report 2014" (PDF). BHP Billiton. January 2015.
{{cite web}}: CS1 maint: url-status (link) - ↑ Glencore restarts Cerrejon after rail blockade, Mining.com, June 2026
- ↑ Faith-based groups submit OECD complaint concerning HSBC financing linked to Cerrejon coal mine in Colombia, World Council of Churches, June 2026
- ↑ "Opinion: Extinction Rebellion must decide if it is anti-capitalist, or pro-greenwashing". The Independent. October 23, 2019.
- ↑ Lisa Josesen Hermann,In a Fight Over a Colombian Coal Mine, Covid-19 Raises the Stakes, UNDARK, July 22, 2020
- ↑ 60.0 60.1 "OECD adds weight to United Nations' BHP investigation". Australian Financial Review. January 19, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ "NGOs file complaint before OECD, demand closure of Cerrejón coal mine in Colombia". Mining.com. January 20, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ "OECD initial assessments in coal mining case relating to BHP, Anglo American and Glencore". Lexology. 2022-01-12.
- ↑ "Initial Assessment: Complaint by Global Legal Action Network (GLAN) against Anglo American Plc, BHP Group Ltd and Glencore International" (PDF). Australian National Contact Point for the OECD Guidelines for Multinational Enterprises. January 10, 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Initial assessment: Global Legal Action Network complaint to the UK NCP about Anglo American". UK National Contact Point (NCP) for the OECD Guidelines for Multinational Enterprises. January 10, 2022.
- ↑ Coal miner Cerrejon to halt operations after blockades cut gasoline supplies, Economic Times, May 24, 2021
- ↑ "Blockades cut 70% of output at Colombia's Cerrejon coal mine". Reuters. September 6, 2022.
- ↑ "Colombia. «Lo único que El cerrejón ha traído es la muerte». Comunidades bloquean operación sur de la mina operada por Glencore". Resumen Latinoamericano. 5 septiembre 2022.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "Mina de carbón Cerrejón en Colombia reduce en un 70% producción por bloqueos". DF Sud. 6 septiembre 2022.
{{cite news}}: Check date values in:|date=(help) - ↑ 69.00 69.01 69.02 69.03 69.04 69.05 69.06 69.07 69.08 69.09 69.10 69.11 url=https://data.carbonmapper.org/
