Changchun Outer Ring High Pressure Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Changchun Outer Ring High Pressure Gas Pipeline 长春市外环天然气高压管网 is an operating gas pipeline in Changchun, Jilin province, China.[1]

Location

The pipeline is operated to run circling Changchun alongside the Changchun Outer Ring Expressway.[1]

Project details

  • Operator:
  • Owner: Changchun Gas Co., Ltd.[2]
  • Parent company:
  • Capacity: 4 bcm/y[1]
  • Length: 128 km[1]
  • Diameter: 800 mm[1]
  • Status: Operating[1]
  • Start year: 2016[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline includes two gate stations, 10 high- and medium-pressure gas pressure regulating stations and related supporting facilities. It plays a strong role in guaranteeing the safe and stable supply of natural gas in Changchun City and its surrounding areas.[1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 长春市外环天然气高压管网正式开通, 新文化报, 2016-12-29
  2. 外环天然气高压管网工程, 国际燃气网,2015-09-23