Crest Steel and Power Mangatta steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Crest Steel and Power Mangatta steel plant is a steel plant in Mangatta, Rajnandgaon, Chhattisgarh, India that operates blast furnace (BF), direct reduced iron (DRI), electric arc furnace (EAF), and induction furnace (IF) technology.
Location
The map below shows the exact location of the plant in Mangatta, Rajnandgaon, Chhattisgarh, India:
- Location: Joratarai Village
- Coordinates (WGS 84): 21.190313, 81.19922 (exact)
Background
Crest Steel and Power Pvt Ltd got incorporated in 2005 for establishing a greenfield mini integrated steel plant.[1] The plant currently operates sponge iron rotary kilns and induction furnaces. According to a prefeasibility report published in May 2022, the company plans to expand capacity from 96 ttpa to over 900 ttpa by adding a 650 m3 blast furnace, two 60 ton electric arc furnaces and additional rotary kilns and induction furnaces. According to the prefeasibility report, the construction of two additional rotary kilns were 60% completed.[2] There has been no updates on the expansion since.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source | Iron ore source | Coal source |
|---|---|---|---|---|
| 2005-01[3] | 2500[4] | 16 MW CPP (8 MW WHRB-based; 8 MW FBC); 3 x 100KW Solar Power[4][5] | unknown | SECL Mines[4] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Atha Group [47.5%]; Ghanashyam Misra & Sons Pvt Ltd [47.5%] | 5064283827 [47.5%]; 5064636420 [47.5%] | E100000134289 [47.5%]; E100002000372 [47.5%] | Crest Steel and Power Pvt Ltd [100%][6] | 4298478658 | E100002007975 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Main production equipment |
|---|---|---|
| finished rolled[7] | bar, coil, rounds, wire rod[7] | BF; DRI; IF; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Induction furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|
| announced | 950[4] | 96[4] | 1046[4] |
| mothballed | – | 34[4] | 34[4] |
| operating | – | 96[4] | 96[4] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|---|
| announced | 728[4] | – | 728[4] |
| construction | – | 232[4] | 232[4] |
| operating | – | 232[4] | 232[4] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Pellets |
|---|
| 1400[4] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | Other/unknown steel production |
|---|---|
| 2019 | unknown |
| 2020 | unknown |
| 2021 | unknown |
| 2022 | unknown |
| 2023 | unknown |
| 2024 | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production |
|---|---|
| 2019 | unknown |
| 2020 | unknown |
| 2021 | unknown |
| 2022 | unknown |
| 2023 | unknown |
| 2024 | unknown |
Unit Details
Table 9: Blast Furnace Details
| Unit name | Status | Announced date | Current size | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown BF (1) | announced[4] | 2022[4] | 650.0[4] | 728[4] |
Table 10: Direct Reduced Iron Furnace Details
| Unit name | Status | Announced date | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown DRI (1) | operating[4] | – | rotary kiln[4] | 116[4] |
| unknown DRI (2) | operating[4] | – | rotary kiln[4] | 116[4] |
| unknown DRI (3) | construction[4] | 2010[4] | rotary kiln[4] | 116[4] |
| unknown DRI (4) | construction[4] | 2010[4] | rotary kiln[4] | 116[4] |
Table 11: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant |
|---|---|
| unknown DRI (1) | coal (solid)[4] |
| unknown DRI (2) | coal (solid)[4] |
| unknown DRI (3) | coal (solid)[4] |
| unknown DRI (4) | coal (solid)[4] |
Table 12: Electric Arc Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|
| unknown EAF (1) | announced[4] | 2022[4] | 475[4] | 60.0[4] |
| unknown EAF (2) | announced[4] | 2022[4] | 475[4] | 60.0[4] |
Table 13: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % basic/merchant pig iron |
|---|---|---|---|---|
| unknown EAF (1) | yes[7] | >0[7] | >0[7] | >0[7] |
| unknown EAF (2) | yes[7] | >0[7] | >0[7] | >0[7] |
Table 14: Induction Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|
| unknown IF (1) | mothballed[4] | – | 17[4] | 7.0 tonnes[4] |
| unknown IF (2) | mothballed[4] | – | 17[4] | 7.0 tonnes[4] |
| unknown IF (3) | operating[4] | 2010[4] | 48[4] | 15.0 tonnes[4] |
| unknown IF (4) | operating[4] | 2010[4] | 48[4] | 15.0 tonnes[4] |
| unknown IF (5) | announced[4] | 2010[4] | 48[4] | 15.0 tonnes[4] |
| unknown IF (6) | announced[4] | 2010[4] | 48[4] | 15.0 tonnes[4] |
Table 15: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % pig iron (unknown if basic/merchant or granulated) |
|---|---|---|---|---|
| unknown IF (1) | yes | >0[7] | >0[7] | – |
| unknown IF (2) | yes[7] | >0[7] | >0[7] | – |
| unknown IF (3) | yes[7] | 10.70[3][8] | 87.20[3][8] | 2.10[3][8] |
| unknown IF (4) | yes[7] | 10.70[3][8] | 87.20[3][8] | 2.10[3][8] |
| unknown IF (5) | yes[7] | >0[7] | >0[7] | – |
| unknown IF (6) | yes[7] | >0[7] | >0[7] | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "ABOUT US". csppl.co.in. Retrieved 2025-10-03.
- ↑ "Pre-feasibility report" (PDF). https://environmentclearance.nic.in/. 2022-05-16. Retrieved 2025-10-03.
{{cite web}}: External link in(help)CS1 maint: url-status (link)|website= - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://csppl.co.in/compliance.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33 4.34 4.35 4.36 4.37 4.38 4.39 4.40 4.41 4.42 4.43 4.44 4.45 4.46 4.47 4.48 4.49 4.50 4.51 4.52 4.53 4.54 4.55 4.56 4.57 4.58 4.59 4.60 4.61 4.62 4.63 4.64 4.65 4.66 4.67 4.68 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/16_May_2022_14430321714279345Crest_PFR.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://csppl.co.in/about-us.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.icra.in/Rationale/ShowRationaleReport?Id=115391.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 7.20 7.21 7.22 https://www.enviscecb.org/pc_523.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 (PDF) https://img1.wsimg.com/blobby/go/cc0a395a-8a9e-4476-86f5-84a05de983d0/downloads/Environment%20Statement%20-%202024.pdf?ver=1753778167881.
{{cite web}}: Missing or empty|title=(help)