DST Nghi Son steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
DST Nghi Son steel plant is a steel plant in Nghi Son, Thanh Hóa, Vietnam that operates electric arc furnace (EAF) technology.
Location
The map below shows the approximate location of the plant in Nghi Son, Thanh Hóa, Vietnam:
- Location: Industrial Park No. 4, Tan Truong commune, Nghi Son town, Thanh Hoa Province, Vietnam
- Coordinates (WGS 84): 19.367379, 105.675841 (approximate)
Background
Thanh Hoa province approved the steel projects with an investment of $231 million in 2023[1]. The project will have an annual capacity of 980 ttpa of hot rolled coil in the first phase, and an extra 330 ttpa steelmaking capacity in the second phase[2].
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Construction date | Workforce size | Power source |
|---|---|---|---|
| 2023-03-01[3] | 2024-12[4] | 10000[5] | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| DST Nghi Son Iron and Steel JSC [100.0%] | unknown [100.0%] | E100001012401 [100.0%] | DST Nghi Son Iron and Steel JSC [100%][5] | unknown | E100001012401 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|---|---|
| semi-finished, finished rolled[5] | pipe, billet, bar, hot rolled, box, steel structures[5] | unknown | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| construction | 1310[6][4] | 1310[6][4] |
Unit Details
Table 5: Electric Arc Furnace Details
| Unit name | Status | Announced date | Construction date | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown EAF (1) | construction[6] | 2023-03-01[3] | 2024-12[4] | 1310[6][4] |
Table 6: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap |
|---|---|---|
| unknown EAF (1) | yes[7] | 100.00[7] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Thanh Hoa province okays $231 mln steel mill". theinvestor.vn. Retrieved 2025-12-05.
- ↑ "Thanh Hoa province okays $231 mln steel mill". theinvestor.vn. Retrieved 2025-12-05.
- ↑ 3.0 3.1 https://web.archive.org/web/20240209185046/https://theinvestor.vn/thanh-hoa-province-okays-231-mln-steel-mill-d3888.html. Archived from the original on 2024-02-09.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://en.vneconomy.vn/thanh-hoa-accelerates-construction-of-super-projects.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240212190258/https://vneconomy.vn/231mln-steel-mill-to-be-built-in-thanh-hoa.htm. Archived from the original on 2024-02-12.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240205205213/https://www.steelmint.com/insights/how-did-vietnam-steel-mills-raw-material-mix-change-in-cy22-468059. Archived from the original on 2024-02-05.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240209184612/https://en.doanhnghiephoinhap.vn/thanh-hoa-steel-rolling-mill-project-of-vnd-5-500-billion-approved.html. Archived from the original on 2024-02-09.
{{cite web}}: Missing or empty|title=(help)
