Dagang–Yongqing Gas Pipelines (1–3)
From Global Energy Monitor
(Redirected from Dagang-Yongqing gas pipeline (1-3))
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
The Dagang–Yongqing Gas Pipelines (1–3) 港清输气管线 (大港-永清一线, 复线, 三线) are three operating natural gas pipelines with a similar route in China.[1]
Location
The pipelines run from Yongqing, Langfang, Hebei, China to Dagang, Tianjin, China.[1]
Project details
- Operator: Petrochina Beijing Gas Pipeline Co., Ltd. 国家管网集团北京管道有限公司
- Parent company: Kunlun Energy
- Capacity: 3.1 billion cubic meters per year (Pipeline 1), 6.3 billion cubic meters per year (Pipeline 2), 9.05 billion cubic meters per year (Pipeline3).
- Length: 120km (Pipeline 1), 108km (Pipeline 2), 162km (Pipeline 3)
- Status: Operating
- Start year: 2004(Pipeline 1)[2], 2008 (Pipeline 2),[2] 2015 (Pipeline 3)[3][2]
Background
The sources of the pipelines are Shaan-Jing Gas Pipeline 2 and Shaan-Jing Gas Pipeline 3. The pipeline connected Shaan-Jing Gas Pipeline 2 and Dagang Underground Gas Storage.[4]
Articles and resources
References
- ↑ 1.0 1.1 港清三线输气管道工程环境影响评价报告简本 Ministry of Ecology and Environment of China, Feb. 2013, accessed Aug. 19, 2021.
- ↑ 2.0 2.1 2.2 "国家管网油气管网设施公平开放信息公开 -天然气管道". www.pipechina.com.cn (in 中文). 2022-08-09. Retrieved 2022-08-17.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 中石油管道局:国家重点工程港清三线成功投产 中国石油报, Nov. 30, 2015, accessed Aug. 19, 2021.
- ↑ 大港储气库之大张坨储气库 储运管网, Jul. 18, 2018, accessed Aug. 19, 2021.