Delong Steel Co Ltd (德龙钢铁有限公司) is a steel plant in Xingtai, Hebei, China that operates basic oxygen furnace (BOF) and blast furnace (BF) technology.
Location
The map below shows the exact location of the plant in Xingtai, Hebei, China:
Location: Zhongyinguo Village, Nanshimen Town, Xingtai County, Xingtai City, Hebei Province
Coordinates (WGS 84 ): 37.086116, 114.384832 (exact)
Background
The Delong Steel Group's Delong Steel Project in Indonesia, with an investment of 1.18 billion US dollars, has a Phase I steel production capacity of 4 million tons. Construction commenced in April 2018 and entered the production phase in April 2020. Currently, Phase I of Delong Steel is expanding to 7 million tons and is under construction, while the Delong Iron and Steel Group is planning an overseas steel project with a capacity of 20 million tons.[ 1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
British Asia Pan Ruogen International Co Ltd [100.0%]
unknown [100.0%]
E100000130417 [100.0%]
DELONG Steel Ltd [100%][ 5]
unknown
E100000126785 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Nominal crude steel capacity (total)
operating
3000[ 2]
3000[ 2]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Nominal iron capacity (total)
operating
3000[ 2]
3000[ 2]
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter
Coke
Pellets
2216[ 7]
NF
NF
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
BOF production
Other/unknown steel production
2019
unknown
unknown
2020
unknown[ 8]
–[ 8]
2021
unknown[ 8]
unknown[ 8]
2022
unknown
unknown
2023
–
unknown
2024
–
–
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
BF production
Other/unknown iron production
Total (all routes)
2019
unknown
unknown
–
2020
2950[ 8]
–[ 8]
2950[ 8]
2021
unknown[ 8]
unknown[ 8]
–[ 8]
2022
unknown
unknown
–
2023
–
unknown
–
2024
–
–
–
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Current size
Current capacity (ttpa)
Decarbonization technology
Most recent relining
BF 1
operating[ 9]
1080.0 m3[ 10] [ 4]
1000[ 2]
unknown
2021[ 11]
BF 2
operating[ 9]
1080.0 m3[ 10] [ 4]
1000[ 2]
unknown
–
BF 3
operating[ 9]
1080.0 m3[ 10] [ 4]
1000[ 2]
unknown
–
Table 10: Basic Oxygen Furnace Details
Unit name
Status
Current capacity (ttpa)
Current size
unknown BOF (1)
operating[ 2]
1500[ 2]
120.0 tonnes[ 10] [ 4]
unknown BOF (2)
operating[ 2]
1500[ 2]
120.0 tonnes[ 10] [ 4]