30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

ESM Mutún steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

ESM Mutún steel plant (Complejo Siderúrgico del Mutún), also known as Empresa Siderurgica Mutun Steel Plant, is a steel plant in Puerto Suárez, Santa Cruz, Bolivia that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Puerto Suárez, Santa Cruz, Bolivia:

Loading map...
  • Location: Puerto Suárez, Santa Cruz, Bolivia
  • Coordinates (WGS 84): -19.137325, -57.880605 (exact)

Plant Details

Table 1: General Plant Details

Announced date Construction date Start date Workforce size Power source
2016-03[1][2] 2019-01[3][4][5] 2025-03[6][7][8] 700[9][5] onsite power plant[10]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Full Empresa Siderúrgica del Mutún 5037336916 E100002000080 Empresa Siderúrgica del Mutún[11] 5037336916 E100002000080

Table 3: Process and Products

Steel product category ISO 14001 ISO 50001 Main production equipment
finished rolled[10] unknown unknown DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
announced 500[12] 500[12]
construction 200[12][13][14][10] 200[12][13][14][10]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
construction 250[14] 250[14]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Pellets
400[14]

Unit Details

Table 7: Direct Reduced Iron Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Furnace type Current capacity (ttpa)
unknown DRI (1) construction[10] 2016-01-20[15][1] 2019-01-29[3] 2025[16] Tenova and Danieli HYL/Energiron[17][17] shaft furnace 250[14]

Table 8: Electric Arc Furnace Details

Unit name Status Announced date Construction date Start date Current capacity (ttpa)
unknown EAF (1) construction[10] 2016-03[1][2] 2019-01[3][4][5] 2025[6][16][8] 200[14][10][13][12]
unknown EAF (2) announced[12] 2023-09[12] 2025[12] 500[12]

Table 9: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated % other iron
unknown EAF (1) None unknown unknown unknown unknown unknown unknown unknown unknown
unknown EAF (2) None unknown unknown unknown unknown unknown unknown unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240906183639/https://china.aiddata.org/projects/55410/. Archived from the original on 2024-09-06. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240119033750/https://todologisticanews.com/site/la-planta-siderurgica-en-mutun-sera-una-realidad-muy-pronto. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20220526212552/https://www.energypress.com.bo/2019/01/24/mutun-el-29-de-enero-se-inicia-la-construccion-de-la-planta-siderurgica/. Archived from the original on 2022-05-26. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://web.archive.org/web/20230624230321/https://oeco.org.br/wp-content/uploads/2023/06/VOCESDELPANTANAL68.pdf. Archived from the original (PDF) on 2023-06-24. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20230327030630/https://www.abi.bo/index.php/noticias/economia/35098-construccion-de-la-siderurgica-del-mutun-tiene-casi-70-de-avance-la-esm-destaca-que-operara-con-jovenes-profesionales-bolivianos. Archived from the original on 2023-03-27. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240111021617/https://www.esm.gob.bo/noticias-detalle.php?id=163. Archived from the original on 2024-01-11. {{cite web}}: Missing or empty |title= (help)
  7. https://www.steelorbis.com/steel-news/latest-news/bolivias-el-mutun-project-to-start-finished-steel-production-in-march-2025-1342002.htm. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240214052330/https://www.ofep.gob.bo/index.php/comunicacion/noticiasplataforma/item/4895-gobierno-ya-trabaja-para-construir-un-segundo-complejo-siderurgico-a-la-brevedad-posible. Archived from the original on 2024-02-14. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240218070232/https://esm.gob.bo/noticias-detalle.php?id=168. Archived from the original on 2024-02-18. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://web.archive.org/web/20230901082725/https://www.ocmal.org/complejo-siderurgico-del-mutun-finalizara-obras-este-ano-y-ahorrara-us-200-millones-al-pais/. Archived from the original on 2023-09-01. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20240703230106/https://www.esm.gob.bo/institucion.php. Archived from the original on 2024-07-03. Retrieved 2024-06-28. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 https://web.archive.org/web/20240906183818/https://abi.bo/index.php/noticias/economia/42188-gobierno-ya-trabaja-para-construir-un-segundo-complejo-siderurgico-a-la-brevedad-posible. Archived from the original on 2024-09-06. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 https://web.archive.org/web/20240916163440/https://www.steelorbis.com/steel-news/latest-news/construction-at-bolivias-mutun-steel-plant-to-be-completed-by-december-1288417.htm. Archived from the original on 2024-09-16. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 https://web.archive.org/web/20240119052521/http://mecc.sinosteel.com/en/service_content.aspx?id=3752. Archived from the original on 2024-01-19. {{cite web}}: Missing or empty |title= (help)
  15. https://www.la-razon.com/economia/2016/01/20/sinosteel-se-adjudica-proyecto-en-el-mutun-por-us-450-mm/. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 https://ahoraelpueblo.bo/index.php/nacional/economia/el-ejecutivo-confirma-que-el-complejo-del-mutun-operara-desde-diciembre. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 https://web.archive.org/web/20240216231307/https://tenova.com/newsroom/latest-tenova/energironr-empresa-siderurgica-del-mutun. Archived from the original on 2024-02-16. {{cite web}}: Missing or empty |title= (help)

Resources